Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Content type
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (6)
- CROSS-UK Newsletter 64 (5)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK Newsletter 67 (5)
- CROSS-UK Newsletter 68 (6)
- CROSS-UK [sub-heading only] (16)
- CROSS Feature Article (1)
- CROSS Newsletter (18)
- CROSS Safety Alert (5)
- CROSS Safety Report (86)
- CROSS Theme Page (2)
- CROSS Topic Paper (3)
- News [sub-heading only] (2)
- Third party content (3)
- Third party content (1)
CROSS regions
The application of rule-based guidance and potential alternative approaches
A reporter raised with CROSS a series of questions and opinions about the treatment of fire risk in buildings and rule based guidance requirements.
17 February 2023
CROSS Safety Report
Report ID: 1142
Region: CROSS-UK
The potential for expertise asymmetry in aspects of the design of tall buildings in the UK
A reporter is concerned about the potential for 'expertise asymmetry' in the fire safety domain, with a focus on smoke control systems.
20 February 2023
CROSS Safety Report
Report ID: 1143
Region: CROSS-UK
Missing fixing strap on Light Gauge Steel Framing System may affect fire performance
A reporter has become aware of several cases where a critical strap has not been installed within a Light Gauge Steel Frame external wall system.
26 August 2022
CROSS Safety Report
Report ID: 1141
Region: CROSS-UK
Corrosion of fixings securing fire resisting plasterboard
A reporter sent pictures from a site where metal plasterboard fixings had deteriorated not long after installation.
1 July 2014
CROSS Safety Report
Report ID: 375
Region: CROSS-UK
Deterioration of walkable sandwich panel ceilings
A reporter has raised concern about a complex and potentially far-reaching concern about unseen progressive deterioration in sandwich ceiling panels that have mineral wool lamella cores.
1 October 2007
CROSS Safety Report
Report ID: 54
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
The potential impact of scaffolding on fire safety
An issue has been raised with CROSS regarding the risk assessment process when scaffolding is present around an in-use building. It is considered that combustible scaffolding elements can potentially facilitate external fire spread, and additionally impact the performance of some of the building’s fire safety measures.
17 February 2023
CROSS Safety Report
Report ID: 1153
Region: CROSS-UK
Responsible Use of Materials – The Structural Engineers’ Path to Climate Change Mitigation
In response to the European legal framework for propelling sustainable investment, the VPI has published a memo on the responsible use of materials; The Structural Engineers’ Path to Climate Change Mitigation.
13 April 2022
Third party content
No worse than existing?
This report discusses the perceived exploitation of a common fire safety argument: the existing condition.
17 February 2023
CROSS Safety Report
Report ID: 1148
Region: CROSS-UK
The selection of principal designer and principal contractor
A reporter is concerned that some organisations that they would normally expect to be appointed as principal designer or principal contractor under the Construction (Design and Management) Regulations 2015 are avoiding such appointments.
17 February 2023
CROSS Safety Report
Report ID: 1150
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.