Safety information search results
Filter your results
Building or structure type
- Bridges (63)
- Buildings
(476)
- Agricultural buildings (9)
- Car parks (18)
- Commercial (41)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (35)
- Health care (14)
- Higher-risk buildings (7)
- Industrial buildings (19)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (14)
- Recreational buildings (8)
- Residential (143)
- Stadiums (5)
- Storage buildings (9)
- Tall buildings (22)
- Theatres & other entertainment buildings (9)
- Transport buildings (6)
- Buried pipes & culverts (6)
- Floating structures (1)
- Freestanding walls (5)
- Marine structures (2)
- Masts & towers (17)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (41)
- Roads (14)
- Sewers (4)
- Temporary structures (43)
- Tunnels (4)
Materials
Project or lifecycle stage
Design
- BIM (5)
- Computational design (12)
- Design: quality management (67)
- Design calculations (72)
- Design conceptualisation (26)
- Design detailing (97)
- Design drawings (29)
- Design loads (107)
- Design software (30)
- Dynamics (9)
- Fire safety design (19)
- Resilience (23)
- Robustness (61)
- Structural design (132)
- Sustainability (9)
Fire incident response
Project type
- Alteration & conversion project (41)
- Assessment project [sub-heading only] (21)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (243)
- Demolition project (16)
- Excavation (16)
- Extension project (21)
- Fire safety assessment (2)
- Groundworks project (3)
- Maintenance project (2)
- New build (106)
- Refurbishment (19)
- Remediation project (22)
- Repair project (10)
- Strengthening project (9)
- Structural assessment (30)
- Underpinning project (4)
Construction period
Elements & systems
- Arch (8)
- Balconies (17)
- Balustrades (24)
- Basements (13)
- Beams (81)
- Bracing (23)
- Cables (4)
- Canopies (7)
- Ceilings (25)
- Cladding (39)
- Columns (44)
- Fasteners & connections (166)
- Fences (1)
- Fire exit doors (2)
- Fire protection (17)
- Foundations (38)
- Insulation (10)
- Light gauge steel framing (6)
- Lintels (4)
- Padstones (5)
- Parapets (10)
- PV panels (3)
- Roofs (71)
- Sandwich panels (2)
- Shear walls (3)
- Signs (4)
- Slabs (54)
- Tendons (2)
- Trusses (8)
- Wall head restraints (3)
- Walls (108)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
- CROSS-UK [sub-heading only]
(55)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (19)
- Local Authority Building Control (LABC) (24)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (8)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (10)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (390)
- CROSS Feature Article (1)
- CROSS Newsletter (235)
- CROSS Review (21)
- CROSS Safety Alert (30)
- CROSS Safety Report (707)
- CROSS Theme Page (3)
- CROSS Topic Paper (24)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (3)
- Safety information [sub-heading only] (1)
- Third party article (1)
- Third party content (11)
- Third party content (5)
- Third party report (1)
CROSS regions
Change in use results in masonry wall failure
A room with walls of traditional cavity and single skin masonry was lined with plywood and used for storage of wood chips. No thought was given to the lateral pressure on the walls which eventually failed.
6 April 2023
CROSS Safety Report
Report ID: 884
Region: CROSS-UK
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Collapse of external brick wall during demolition works
A section of an external brick wall of a building collapsed suddenly and unexpectedly part way through a demolition contract.
13 December 2022
CROSS Safety Report
Report ID: 875
Region: CROSS-UK
Mesh flooring safety issues
A reporter has recently witnessed a number of safety issues with open grid mesh flooring.
10 February 2023
CROSS Safety Report
Report ID: 913
Region: CROSS-UK
Concerns over old wall misuse
A reporter is concerned about the stability of a boundary wall after a neighbour carried out works adjacent to it.
13 December 2022
CROSS Safety Report
Report ID: 846
Region: CROSS-UK
Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK
Collapse of brick arch overbridge during demolition
A reporter describes a project where a flanking brick arch collapsed during the demolition of two multi-span bridges over rail lines.
30 June 2022
CROSS Safety Report
Report ID: 573
Region: CROSS-UK
Failure of cast-in wire lifting loops on manhole cover slabs
A cast-in wire lifting loop failed when lifting a 4m diameter precast manhole cover slab into place.
23 May 2022
CROSS Safety Report
Report ID: 629
Region: CROSS-UK
Behaviour of Phase Change Materials in fire when incorporated in linings in buildings
A reporter raised a concern regarding the perception and use of products that incorporate Phase Change Materials (PCMs).
24 May 2023
CROSS Safety Report
Report ID: 698
Region: CROSS-UK
Failure of vertical bracing system in coffee shop
A reporter noticed that a bolt at a low level connecting node of the vertical bracing system in a public building had failed.
30 June 2022
CROSS Safety Report
Report ID: 759
Region: CROSS-UK