Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Structural misunderstanding leads to historic church tower nearly being demolished
A historic church stands at the center of a charming town. Highlighted among many striking features is the iconic 170-foot (52m) bell tower, which looms over the town. For decades, the tower has become the centerpiece for cultural events in addition to being the original community center of worship.
2 May 2023
CROSS Safety Report
Report ID: 1013
Region: CROSS-US
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Channel slab roof deck collapse during reroofing
This report highlights the structural risk caused by machinery during reroof a project.
10 May 2021
CROSS Safety Report
Report ID: 970
Region: CROSS-US
Fire evacuation concerns from large panel system tower blocks
A reporter highlights concerns about how alterations to a large panel system (LPS) roof may affect any evacuations from the rooftop by helicopter rescues.
1 April 2010
CROSS Safety Report
Report ID: 160
Region: CROSS-UK
Snow loading in Scotland - summary of reports
There were heavy snowfalls over the entire United Kingdom in the winters of 2009/2010 and 2010/2011 and CROSS received a number of reports, mostly from Scotland where a significant number of buildings suffered roof collapses.
1 July 2011
CROSS Safety Report
Report ID: 264
Region: CROSS-UK
Snow loads on agricultural buildings in Scotland
The reporter raises concerns that the snow loading situation with regards to agricultural buildings (in Scotland) and perhaps all buildings may require review.
1 July 2011
CROSS Safety Report
Report ID: 248
Region: CROSS-UK
Overloading a portal frame with suspended services
A reporter designing a single storey portal frame used a standard roof service loading of 0.25kN/m2. After the project was completed, a tenant for the unit took over fit out and added a considerable amount of sprinkler pipework into the roof. This created local overloading.
21 August 2023
CROSS Safety Report
Report ID: 1195
Region: CROSS-UK
Snow loading in Scotland - collapsed warehouses
A reporter provided a list of 40 whisky warehouse buildings that had collapsed in the recent heavy snow conditions in northern Scotland (January/February 2010).
1 July 2011
CROSS Safety Report
Report ID: 193
Region: CROSS-UK