Safety information search results
Filter your results
Building or structure type
- Bridges (18)
- Buildings
(141)
- Agricultural buildings (2)
- Car parks (2)
- Commercial (11)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (2)
- Higher-risk buildings (2)
- Industrial buildings (4)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (41)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (10)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Buried pipes & culverts (1)
- Freestanding walls (3)
- Masts & towers (7)
- Railways (8)
- Retaining structures (13)
- Roads (5)
- Sewers (1)
- Temporary structures (15)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (13)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (100)
- Demolition project (6)
- Excavation (10)
- Extension project (9)
- Fire safety assessment (1)
- Groundworks project (1)
- New build (58)
- Refurbishment (2)
- Remediation project (8)
- Repair project (4)
- Strengthening project (4)
- Structural assessment (10)
Method of construction
Elements & systems
- Arch (4)
- Balconies (7)
- Balustrades (10)
- Basements (7)
- Beams (38)
- Bracing (13)
- Cables (1)
- Canopies (3)
- Ceilings (7)
- Cladding (12)
- Columns (21)
- Fasteners & connections (51)
- Fences (1)
- Fire exit doors (1)
- Fire protection (7)
- Foundations (13)
- Insulation (3)
- Light gauge steel framing (2)
- Padstones (2)
- Parapets (2)
- Roofs (17)
- Shear walls (1)
- Signs (1)
- Slabs (16)
- Trusses (2)
- Walls (30)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (7)
- CROSS-UK Newsletter 33 (6)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (7)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK [sub-heading only] (198)
- (-) CROSS Newsletter (235)
- CROSS Safety Report (235)
- News [sub-heading only] (26)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Local wind effects at high level
A reporter shares their experience on the wind speeds they encountered when carrying out high level works on a city centre building.
1 July 2016
CROSS Safety Report
Report ID: 548
Region: CROSS-UK
Inadequate storage of glazing panels
A reporter raises concerns about how glazing panels are being stored on sites. They have witnessed scenarios where panels are not being individually tied back to storage frames or to a secure place.
1 April 2016
CROSS Safety Report
Report ID: 532
Region: CROSS-UK
Installation of PV panels
A reporter's firm believes an oversaturated market of engineers carrying out assessments has drove the prices for assessments on roof structures accommodating PV panels down.
1 April 2016
CROSS Safety Report
Report ID: 533
Region: CROSS-UK
Failure to check designs produced by software
Concerns were raised about a proprietary design software after a building control officer noticed a regular error appearing while checking calculations provided to them.
1 January 2016
CROSS Safety Report
Report ID: 538
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Injuries from falling scaffold tube
Two children received injuries when a scaffold tube fell from height.
1 July 2016
CROSS Safety Report
Report ID: 571
Region: CROSS-UK
Embankment slip during excavation works
Concerns were raised and strengthening works required after vertical movement was observed on the safety critical surface at the top of an 8m high embankment.
1 October 2016
CROSS Safety Report
Report ID: 572
Region: CROSS-UK
Independence of Approved Inspectors
A reporter believes public awareness should be raised regarding the possibility that building control can be performed under a business to business commercial contract for the interest of someone other than property owners.
1 July 2015
CROSS Safety Report
Report ID: 507
Region: CROSS-UK
Policing of CE marking on steelwork
A reporter has a question regarding structural steel safety, particularly on steel gantry systems supporting lifting equipment.
1 July 2015
CROSS Safety Report
Report ID: 510
Region: CROSS-UK