Safety information search results
Filter your results
Building or structure type
Building height
Materials
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS Newsletter (3)
- CROSS Safety Report (9)
- News [sub-heading only] (1)
CROSS regions
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK
Inadequate design for basement works
An inadequate structural design for alterations to a basement led to structural distress within a substantial five-storey townhouse.
21 November 2022
CROSS Safety Report
Report ID: 1132
Region: CROSS-UK
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Need for licensed builders
A reporter feels certain building work should only be carried out by licensed qualified builders.
1 January 2011
CROSS Safety Report
Report ID: 214
Region: CROSS-UK
Unsuitable underpinning
When reviewing a consulting engineer’s proposal to underpin a party wall, the reporter noticed that there was insufficient vertical load to maintain stability under lateral load from the retained height of soil.
1 July 2010
CROSS Safety Report
Report ID: 175
Region: CROSS-UK
Failure of existing basement wall
A basement retaining wall failed when a new basement was formed by excavating 1.8m.
1 July 2014
CROSS Safety Report
Report ID: 385
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
New basements beneath existing properties
A reporter is concerned about the construction of some basements in London.
1 April 2013
CROSS Safety Report
Report ID: 297
Region: CROSS-UK
Basement party walls
The client's consulting engineer had designed a new basement but, when queried by the consulting engineer for the main contractor, was unable to provide survey information for the adjoining property.
1 January 2014
CROSS Safety Report
Report ID: 361
Region: CROSS-UK