Safety information search results
Filter your results
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (4)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (11)
- Extension project (3)
- Fire safety assessment (1)
- Maintenance project (1)
- New build (5)
- Refurbishment (2)
- Remediation project (1)
- Repair project (1)
- Structural assessment (1)
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK [sub-heading only] (12)
- CROSS Feature Article (1)
- CROSS Newsletter (7)
- CROSS Safety Alert (4)
- CROSS Safety Report (20)
- CROSS Topic Paper (1)
- News [sub-heading only] (7)
CROSS regions
Snow loading on buildings
In 2010 there was heavy snow in many parts of the UK, but particularly in Scotland, where a number of buildings, mainly agricultural, collapsed under the weight of snow (up to 1.2m in some cases).
1 February 2010
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Installation of timber joist hangers
Joist hanger failures have been found to occur as a result of several types of building defects as listed in the Alert.
1 July 2006
CROSS Safety Alert
Region: CROSS-UK
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
Preventing the collapse of free-standing masonry walls
There have been collapses of free-standing masonry walls over many years and there have been fatalities and numerous injuries; particularly to children.
1 September 2014
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Incompetent design of simple steel beams
This report concerns designs for simple steel beams submitted to building control bodies under Part A of the Building Regulations. The reporter, a checking engineer for a building control body, was not able to accept the effective length and restraints assumed in a number of submitted designs. Most originated from individuals who used proprietary structural design computer packages without, i...
24 May 2023
CROSS Safety Report
Report ID: 1183
Region: CROSS-UK
Apparently simple home improvement work leads to dangerous situation
Apparently simple home improvement work, consisting of reroofing and a loft conversion, resulted in a 'near miss' with potentially dangerous conditions for neighbours.
21 August 2023
CROSS Safety Report
Report ID: 1173
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Cross-laminated timber (CLT) in multi-storey buildings
The CROSS-UK Fire Safety Expert Panel share their views about the interpretation and application of the Building Act 1984 with regards to the use of cross-laminated timber (CLT) in multi-storey buildings.
3 August 2021
CROSS Feature Article
Region: CROSS-UK
Building regulations submissions
This report has been written on behalf of a group of senior local government structural engineers who refer to previous CROSS newsletters and in particular the reports relating to the poor quality of building regulation submissions and lack of checking resources.
1 July 2007
CROSS Safety Report
Report ID: 65
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.