Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (3)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (25)
- CROSS Newsletter (15)
- CROSS Safety Report (50)
- News [sub-heading only] (3)
CROSS regions
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
Failure of prestressed hollowcore units during storage and transport
A reporter shares their experience of the failure of prestressed hollowcore units during storage and transport.
1 June 2022
CROSS Safety Report
Report ID: 748
Region: CROSS-UK
Understanding finite element analysis for pile caps
A reporter questions the validity of using two-dimensional finite element (2D FE) shells to model structural elements such as pile caps.
18 October 2023
CROSS Safety Report
Report ID: 1152
Region: CROSS-UK
RAAC assessment undertaken by persons not suitably experienced
A reinforced aerated autoclaved concrete (RAAC) assessment was carried out by persons who did not appear to have appropriate experience, potentially putting building users at risk of harm.
21 August 2023
CROSS Safety Report
Report ID: 1224
Region: CROSS-UK
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Continuously threaded reinforcing bar
This report highlights the difficulty of inspecting continuously threaded reinforcing bars to ensure that they have been adequately inserted into the cast-in ferrules.
2 August 2022
CROSS Safety Report
Report ID: 1074
Region: CROSS-AUS
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Waterproofing exposed concrete slabs
This report highlights that water ingress into buildings continues to be a problem and discusses the role of the structural engineer when dealing with waterproofing of exposed concrete slabs. It shows how this can be achieved by careful design and detailing of the reinforced concrete structure and by close collaboration of all parties involved.
25 November 2021
CROSS Safety Report
Report ID: 959
Region: CROSS-AUS
Punching shear in concrete slabs at perimeter columns
A reporter raises concerns about the underestimation of bending moments in perimeter columns when assessing punching shear in adjacent concrete slabs. Punching shear failures can be brittle and catastrophic. Designers need to include the appropriate ultimate moment in the design actions.
14 October 2022
CROSS Safety Report
Report ID: 1122
Region: CROSS-AUS
Reinforced aerated autoclaved concrete planks found on pitched roof of 1990s hospital building
A building constructed in the early 1990s has been found to contain reinforced aerated autoclaved concrete (RAAC) planks. This date is important since it is much later than the previously thought last significant use of RAAC in buildings in the UK and potentially affects the scope of buildings that could require screening for RAAC problems.
26 August 2022
CROSS Safety Report
Report ID: 1125
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.