Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Elements & systems
- Balconies (3)
- Balustrades (1)
- Basements (1)
- Beams (22)
- Bracing (5)
- Canopies (1)
- Cladding (3)
- Columns (15)
- Fasteners & connections (21)
- Fire protection (3)
- Foundations (12)
- Insulation (1)
- Light gauge steel framing (3)
- Lintels (1)
- Padstones (2)
- Parapets (1)
- Roofs (3)
- Slabs (15)
- Tendons (1)
- Wall head restraints (1)
- Walls (14)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (5)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK [sub-heading only] (56)
- CROSS-US Newsletter 3 (3)
- CROSS Newsletter (43)
- CROSS Safety Report (84)
- News [sub-heading only] (14)
CROSS regions
Major safety defects in hospital
A number of construction defects were found in a hospital following the inspection of the external wall system.
29 March 2021
CROSS Safety Report
Report ID: 826
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Steel portal frame erection
A reporter describes how a steel portal frame collapsed during its erection.
1 March 2006
CROSS Safety Report
Report ID: 20
Region: CROSS-UK
Mobile phone masts
The concern of an overseas reporter is that erection, foundation design and construction, and maintenance of mobile phone masts are not carried out adequately.
1 March 2006
CROSS Safety Report
Report ID: 22
Region: CROSS-UK
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Very slender props
A reporter noticed prop that did not have ties installed while carrying out a site inspection.
1 July 2007
CROSS Safety Report
Report ID: 34
Region: CROSS-UK
Missing starter bars
During an inspection the reporter observed that all the continuity starter bars projecting from the wall kicker were in fact loose.
1 July 2007
CROSS Safety Report
Report ID: 37
Region: CROSS-UK
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Fire compartmentation detailing issues
Two reports have been received concerning fire compartmentation detailing issues; one on the incorrect installation of fire batts and the other on the incorrect use of intumescent material.
18 August 2021
CROSS Safety Report
Report ID: 1039
Region: CROSS-UK