Safety information search results
Filter your results
Building or structure type
- Bridges (63)
- Buildings
(489)
- Agricultural buildings (9)
- Car parks (17)
- Commercial (46)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (36)
- Health care (15)
- Higher-risk buildings (6)
- Industrial buildings (23)
- Laboratory buildings (1)
- LPS buildings (3)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (14)
- Recreational buildings (8)
- Residential (140)
- Stadiums (5)
- Storage buildings (11)
- Tall buildings (22)
- Theatres & other entertainment buildings (10)
- Transport buildings (6)
- Buried pipes & culverts (7)
- Floating structures (1)
- Freestanding walls (5)
- Marine structures (3)
- Masts & towers (18)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (41)
- Roads (13)
- Sewers (5)
- Temporary structures (42)
- Tunnels (4)
Building height
Materials
Project or lifecycle stage
Design
- BIM (5)
- Computational design (12)
- Design: quality management (67)
- Design calculations (73)
- Design conceptualisation (27)
- Design detailing (99)
- Design drawings (33)
- Design loads (112)
- Design software (31)
- Dynamics (11)
- Fire safety design (17)
- Resilience (24)
- Robustness (61)
- Structural design (138)
- Sustainability (9)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (42)
- Assessment project [sub-heading only] (19)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (242)
- Demolition project (16)
- Excavation (17)
- Extension project (21)
- Fire safety assessment (1)
- Groundworks project (3)
- Maintenance project (3)
- New build (102)
- Refurbishment (21)
- Remediation project (19)
- Repair project (9)
- Strengthening project (8)
- Structural assessment (27)
- Underpinning project (4)
Construction period
Elements & systems
- Arch (8)
- Balconies (17)
- Balustrades (23)
- Basements (13)
- Beams (80)
- Bracing (23)
- Cables (3)
- Canopies (8)
- Ceilings (24)
- Cladding (39)
- Columns (43)
- Fasteners & connections (168)
- Fences (1)
- Fire exit doors (2)
- Fire protection (15)
- Foundations (38)
- Insulation (9)
- Light gauge steel framing (9)
- Lintels (3)
- Padstones (5)
- Parapets (10)
- PV panels (4)
- Roofs (76)
- Sandwich panels (3)
- Shear walls (3)
- Signs (4)
- Slabs (51)
- Tendons (1)
- Trusses (9)
- Wall head restraints (3)
- Walls (115)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
- CROSS-AUS [sub-heading only] (10)
- CROSS-UK [sub-heading only]
(49)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (2)
- Health and Safety Executive (HSE) (16)
- Local Authority Building Control (LABC) (19)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
- CROSS-US [sub-heading only] (1)
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (6)
- CROSS-AUS Newsletter 3 (5)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (12)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (8)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (6)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (10)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (375)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (3)
- CROSS Feature Article (1)
- CROSS Newsletter (222)
- CROSS Review (21)
- CROSS Safety Alert (30)
- CROSS Safety Report (730)
- CROSS Theme Page (3)
- CROSS Topic Paper (24)
- News [sub-heading only] (74)
- Safety information from CROSS [sub-heading only] (3)
- Safety information [sub-heading only] (4)
- Third party article (1)
- Third party content (11)
- Third party content (5)
- Third party report (1)
CROSS regions
Failure of vertical bracing system in coffee shop
A reporter noticed that a bolt at a low level connecting node of the vertical bracing system in a public building had failed.
30 June 2022
CROSS Safety Report
Report ID: 759
Region: CROSS-UK
Dangerous defects in curtain wall glazing
This report concerns a 5m high vertical glazing system in which the fixings for a panel failed after only four years because of a lack of co-ordination between designers and contractors.
6 April 2023
CROSS Safety Report
Report ID: 762
Region: CROSS-UK
Corrosion of bridge girder beams
Severe corrosion of bridge girder beams was found during intrusive inspections.
23 May 2022
CROSS Safety Report
Report ID: 772
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Corrosion of steel truss footbridge
Severe corrosion was found in a steel truss footbridge during a planned examination.
23 May 2022
CROSS Safety Report
Report ID: 774
Region: CROSS-UK
Retaining wall collapses onto rail track
A retaining wall failed and collapsed onto a railway track.
1 June 2022
CROSS Safety Report
Report ID: 775
Region: CROSS-UK
Retaining wall collapsed onto highway due to heavy rain
A 2.5m high sandstone retaining wall collapsed onto a highway following a period of heavy rain.
1 June 2022
CROSS Safety Report
Report ID: 791
Region: CROSS-UK
Questionable temporary works used to retain embankment excavation
This report is about the need for properly engineered retaining walls for all heights of retained materials.
1 June 2022
CROSS Safety Report
Report ID: 806
Region: CROSS-UK
Slipform temporary works design
A reporter was performing a CAT III check on a 14 storey slipform design when they discovered that the temporary works design was inadequate.
5 September 2022
CROSS Safety Report
Report ID: 809
Region: CROSS-UK
Has the role of building control changed?
A reporter raises a query about the role of Building Control.
5 September 2022
CROSS Safety Report
Report ID: 810
Region: CROSS-UK