Safety information search results
Filter your results
Building or structure type
- Bridges (18)
- Buildings
(141)
- Agricultural buildings (2)
- Car parks (2)
- Commercial (11)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (2)
- Higher-risk buildings (2)
- Industrial buildings (4)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (41)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (10)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Buried pipes & culverts (1)
- Freestanding walls (3)
- Masts & towers (7)
- Railways (8)
- Retaining structures (13)
- Roads (5)
- Sewers (1)
- Temporary structures (15)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (13)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (100)
- Demolition project (6)
- Excavation (10)
- Extension project (9)
- Fire safety assessment (1)
- Groundworks project (1)
- New build (58)
- Refurbishment (2)
- Remediation project (8)
- Repair project (4)
- Strengthening project (4)
- Structural assessment (10)
Method of construction
Elements & systems
- Arch (4)
- Balconies (7)
- Balustrades (10)
- Basements (7)
- Beams (38)
- Bracing (13)
- Cables (1)
- Canopies (3)
- Ceilings (7)
- Cladding (12)
- Columns (21)
- Fasteners & connections (51)
- Fences (1)
- Fire exit doors (1)
- Fire protection (7)
- Foundations (13)
- Insulation (3)
- Light gauge steel framing (2)
- Padstones (2)
- Parapets (2)
- Roofs (17)
- Shear walls (1)
- Signs (1)
- Slabs (16)
- Trusses (2)
- Walls (30)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (7)
- CROSS-UK Newsletter 33 (6)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (7)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK [sub-heading only] (198)
- (-) CROSS Newsletter (235)
- CROSS Safety Report (235)
- News [sub-heading only] (26)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Issues with lifting large glazing unit
Inadequate instructions were provided by a glazing pane supplier on how to lift and move their product off of a truck and onto the works.
1 April 2016
CROSS Safety Report
Report ID: 176
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Inadequate steel beam splice
A reporter raises concerns of an inadequate steel beam splice they came across on site.
1 October 2013
CROSS Safety Report
Report ID: 343
Region: CROSS-UK
Viaduct survey concerns
A reporter raises concerns about a small four span brickwork railway viaduct that has been degrading for some time.
1 January 2014
CROSS Safety Report
Report ID: 346
Region: CROSS-UK
Timber roof truss bracing problem
Lateral movement of the roof tiles on a two-storey mid-terrace house built approximately 35 years ago with a trussed rafter roof led to the discovery of broken bracing.
1 July 2014
CROSS Safety Report
Report ID: 354
Region: CROSS-UK
Offshore tower failure
The top two thirds of a three part off-shore lattice mast failed due to problems with some of the connection bolts.
1 January 2014
CROSS Safety Report
Report ID: 358
Region: CROSS-UK
Design deficiencies in long span steelwork portal
A firm commissioned to design steel joints on a large portal frame structure noticed that there was lack of restraint to a series of long span rafters.
1 October 2013
CROSS Safety Report
Report ID: 329
Region: CROSS-UK
Certification of steel sheet piling
A Government Agency raises concerns about the authenticity of documents provided for steel sheet piles produced by an overseas manufacturer.
1 January 2013
CROSS Safety Report
Report ID: 331
Region: CROSS-UK
Falsework support to a bridge – a near miss
This report follows the near collapse of a birdcage scaffold falsework structure during an 800 cubic metre concrete pour on a motorway bridge.
1 October 2012
CROSS Safety Report
Report ID: 333
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.