Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
CROSS regions
Responsible Use of Materials – The Structural Engineers’ Path to Climate Change Mitigation
In response to the European legal framework for propelling sustainable investment, the VPI has published a memo on the responsible use of materials; The Structural Engineers’ Path to Climate Change Mitigation.
13 April 2022
Third party content
Effects of scale
This Alert has been prompted by concerns raised about some particularly large structures and is based on evidence made known to SCOSS.
1 November 2018
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Assessment and inspection of buildings
SCOSS has been concerned for some time (2003) at the potential for deterioration of buildings and other facilities during their working lives such that there results an inadequate reserve of strength against collapse of the whole or part of the structure.
1 September 2010
CROSS Topic Paper
Region: CROSS-UK
Structural safety when designing lean in the climate emergency
The IStructE Safety, Health and Wellbeing Panel considers the safety implications when aspiring to a lean design.
4 January 2021
Third party content
Publisher: The Institution of Structural Engineers
Structural fire safety when responding to the climate emergency
Luke Bisby urges structural engineers to improve their understanding of ‘fire resistance’ as the profession looks to innovate rapidly in response to climate change.
1 February 2021
Third party content
Publisher: The Institution of Structural Engineers
The risk of collapse of multi-storey CLT buildings during a fire
A reporter presents concerns about the fire safety of multi-storey buildings comprised of cross-laminated timber (CLT) structures.
29 March 2021
CROSS Safety Report
Report ID: 966
Region: CROSS-UK
Snow loading in Scotland - summary of reports
There were heavy snowfalls over the entire United Kingdom in the winters of 2009/2010 and 2010/2011 and CROSS received a number of reports, mostly from Scotland where a significant number of buildings suffered roof collapses.
1 July 2011
CROSS Safety Report
Report ID: 264
Region: CROSS-UK
Risks from off-site manufacture and hybrid construction
A reporter was recently investigating a ‘near miss’ involving concrete construction in which pre-cast and in-situ concrete were used in combination.
1 January 2016
CROSS Safety Report
Report ID: 529
Region: CROSS-UK
Structures at risk from scour and erosion
Following some recent structural failures, a reporter is concerned that asset owners may not fully realise risks associated with scour and erosion.
1 January 2020
CROSS Safety Report
Report ID: 617
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.