Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (3)
- Construction project [sub-heading only] (31)
- Demolition project (1)
- Excavation (2)
- Extension project (1)
- Groundworks project (2)
- New build (9)
- Refurbishment (2)
- Remediation project (2)
- Repair project (3)
- Strengthening project (5)
- Structural assessment (4)
Method of construction
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (22)
- CROSS Newsletter (18)
- CROSS Safety Alert (1)
- CROSS Safety Report (59)
- CROSS Theme Page (1)
- CROSS Topic Paper (3)
- News [sub-heading only] (2)
- Safety information [sub-heading only] (1)
- Third party content (1)
CROSS regions
Use of temporary barriers to control access to hazards
This report highlights the risks associated with the use of temporary barriers to control access to unsafe workplaces. It discusses the issues when scaffolding is used as a barrier, and that this should only be considered for use as a short-term temporary barrier.
25 November 2021
CROSS Safety Report
Report ID: 980
Region: CROSS-AUS
Problem when launching a prestressed beam
When lowered onto its elastomeric bearings, a 40m span post-tensioned āIā beam started to move towards the outer edge of the pier cap.
30 July 2021
CROSS Safety Report
Report ID: 1027
Region: CROSS-UK
Preparation of holes in concrete for chemical anchors
Reinforcement intended to be resin anchored into concrete was not anchored, because the resin did not cure, due to contamination within the holes.
6 June 2022
CROSS Safety Report
Report ID: 1096
Region: CROSS-UK
Failure of metal cladding panels on bridges
This report discusses the findings of an investigation into the causes of the failure of metal cladding panels on a bridge parapet and provides recommendations concerning the use of pop rivets to fix such panels.
23 February 2024
CROSS Safety Report
Report ID: 944
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Fall of bridge deck support due to bolt over-tightening
A 7t steel frame designed to temporarily support part of a bridge deck during bearing refurbishments work fell from height as it was about to be lowered some 21m to the ground.
1 January 2011
CROSS Safety Report
Report ID: 216
Region: CROSS-UK
Asymmetric bridge design and construction ā a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK