Safety information search results
Filter your results
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK [sub-heading only] (9)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (3)
- (-) CROSS Safety Report (13)
- News [sub-heading only] (1)
CROSS regions
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Ceiling collapse in an educational building
A suspended ceiling in a large teaching hall collapsed days before the official opening of a new educational building.
1 April 2008
CROSS Safety Report
Report ID: 100
Region: CROSS-UK
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Demolition risks
This report is about the collapse of a flat slab building that occurred overseas whilst the top floor of the building was being demolished onto the next floor down.
1 January 2008
CROSS Safety Report
Report ID: 96
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Lightweight steel roof partial collapse
A hall constructed from thin cold rolled steel sections riveted together started collapsing when tiles were loaded on one side only.
1 April 2014
CROSS Safety Report
Report ID: 383
Region: CROSS-UK
Modifications to balustrades in a shopping centre
A reporter raises concerns about balustrades on a balcony at an existing shopping centre which they feel may not be adequate for their purpose.
1 July 2013
CROSS Safety Report
Report ID: 336
Region: CROSS-UK
Masonry fall due to high wind
A five block high masonry wall collapsed during high winds.
1 January 2012
CROSS Safety Report
Report ID: 295
Region: CROSS-UK
Collapse of infill wall panel
A blockwork infill wall panel approximately 4m wide and 9m high between two building collapsed in high winds.
1 July 2015
CROSS Safety Report
Report ID: 511
Region: CROSS-UK
Wind damage to roof with PV panels
A reporter describes how during a heavy storm a big area of roof tiles that were adjacent to PV panels blew down.
1 October 2016
CROSS Safety Report
Report ID: 590
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.