Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
Issues with imported steel
Defective steel, says a reporter, was found in a major retail store where the material had been imported from a supplier overseas.
1 October 2014
CROSS Safety Report
Report ID: 474
Region: CROSS-UK
Fabrication issues with imported steelwork truss in Australia
A reporter raises concerns after a steel truss had significant defects and deflected after erection requiring rectification.
1 July 2014
CROSS Safety Report
Report ID: 390
Region: CROSS-UK
Glazing design and horizontal barrier loading
A reporter shares problems they have encountered with barrier loading requirements on a curtain walling glazing system.
1 July 2020
CROSS Safety Report
Report ID: 899
Region: CROSS-UK
Contractor installs incorrect steel grade
A reporter came across an issue where the fabricator had used cold formed S235 commodity steel SHS rather than the specified hot formed S275 structural steel SHS.
1 April 2018
CROSS Safety Report
Report ID: 634
Region: CROSS-UK
Inability of roller shutter doors to resist wind pressures
Concerns are raised after two sets of roller shutter doors failed within weeks of installation at winds far below the design pressures.
1 July 2017
CROSS Safety Report
Report ID: 663
Region: CROSS-UK