Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (3)
- CROSS Newsletter (5)
- CROSS Safety Report (20)
- News [sub-heading only] (1)
CROSS regions
Battery Energy Storage System concerns
A reporter informed CROSS about issues that emerged, and had to be resolved, in the design and management of Battery Energy Storage Systems.
24 May 2023
CROSS Safety Report
Report ID: 1166
Region: CROSS-UK
Potential overcrowding in education premises
A reporter expresses concern about the potential for greater occupancy numbers than planned for in lecture theatres within education premises.
21 August 2023
CROSS Safety Report
Report ID: 1202
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
Fire resisting doors fixed open in hot weather
When visiting a client during a period of unusually hot weather, it was noted that the vast majority of the building’s fire resisting door sets were wedged open in an attempt to increase ventilation and reduce internal temperatures.
21 August 2023
CROSS Safety Report
Report ID: 1162
Region: CROSS-UK
Fire hazards in historical modular timber framed buildings
A reporter has raised fire safety concerns suggesting the potential existence of a systemic issue pertaining to the design and construction of modular timber frame systems.
20 February 2024
CROSS Safety Report
Report ID: 1243
Region: CROSS-UK
Polyethylene core cladding panels on a high-rise building
A reporter has raised concerns based on a past visit to a residential tower block in 2011 that had a similar type of rainscreen panel to the one used on the Grenfell Tower.
1 July 2017
CROSS Safety Report
Report ID: 682
Region: CROSS-UK
Combustible insulation under rainscreen cladding
Whilst walking past a tall residential building under construction, a reporter observed the facade build-up to consist of combustible insulation with a rainscreen cladding.
1 April 2018
CROSS Safety Report
Report ID: 726
Region: CROSS-UK
Unauthorised structural alterations to accommodate drainpipes
A reporter became aware of cases where main structural steel sections were ‘butchered’ on site to accommodate drainpipes.
1 July 2020
CROSS Safety Report
Report ID: 902
Region: CROSS-UK
Fire risks in multi-storey car parks
A reporter is concerned by the reluctance of the industry to voluntarily take on board and proactively react to the lessons learnt from the fire at the Echo Arena car park in Liverpool.
14 October 2020
CROSS Safety Report
Report ID: 940
Region: CROSS-UK
Suspended ceiling partial collapse
A reporter was asked to investigate a suspended ceiling, formed from a lay-in grid, that had partially collapsed in a school classroom.
1 January 2020
CROSS Safety Report
Report ID: 854
Region: CROSS-UK