Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK [sub-heading only] (7)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (8)
- CROSS Safety Report (12)
- News [sub-heading only] (2)
CROSS regions
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Floor vibration in a gym
Vibration within the floor structure of a second floor gym gives rise to concern of structural resonance and possible fatigue of structural members.
26 August 2022
CROSS Safety Report
Report ID: 1106
Region: CROSS-UK
Steel column erection anchoring connection failure injured worker
This report describes how a construction worker was injured during the erection of a steel column due to shortcomings in erection procedures and inadequacies in a column base connection.
10 May 2021
CROSS Safety Report
Report ID: 992
Region: CROSS-US
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Incompetent design of simple steel beams
This report concerns designs for simple steel beams submitted to building control bodies under Part A of the Building Regulations. The reporter, a checking engineer for a building control body, was not able to accept the effective length and restraints assumed in a number of submitted designs. Most originated from individuals who used proprietary structural design computer packages without, i...
24 May 2023
CROSS Safety Report
Report ID: 1183
Region: CROSS-UK
Inadequate bolted connections supporting stairs
Concerns are raised over the safe design and installation of rolled steel angles (RSA) used to support heavy precast stair and landing units.
1 April 2017
CROSS Safety Report
Report ID: 615
Region: CROSS-UK
Dangerous balcony construction
During an investigation of a balcony construction, a reporter discovered serious inadequacies related to a total lack of coordination between sub-contract work packages coupled with a lack of appropriate supervision.
1 January 2018
CROSS Safety Report
Report ID: 694
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Steel canopy collapse during building completion works
During the construction of a new school, a long span steel truss failed, resulting in the collapse of a canopy.
1 July 2017
CROSS Safety Report
Report ID: 664
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Submit a report