Safety information search results
Filter your results
Building or structure type
- Bridges (18)
- (-)
Buildings
(514)
- Agricultural buildings (9)
- Car parks (18)
- Commercial (48)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (38)
- Health care (16)
- Higher-risk buildings (6)
- Industrial buildings (23)
- Laboratory buildings (1)
- LPS buildings (3)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (14)
- Recreational buildings (9)
- Residential (149)
- Stadiums (6)
- Storage buildings (11)
- Tall buildings (23)
- Theatres & other entertainment buildings (11)
- Transport buildings (6)
- Buried pipes & culverts (1)
- Floating structures (1)
- Freestanding walls (3)
- Marine structures (2)
- Masts & towers (4)
- Railways (4)
- Reservoirs & dams (1)
- Retaining structures (11)
- Roads (2)
- Sewers (1)
- Temporary structures (7)
Building height
Materials
Project or lifecycle stage
Design
- BIM (3)
- Computational design (11)
- Design: quality management (45)
- Design calculations (54)
- Design conceptualisation (29)
- Design detailing (90)
- Design drawings (27)
- Design loads (81)
- Design software (22)
- Dynamics (10)
- Fire safety design (15)
- Resilience (19)
- Robustness (49)
- Structural design (89)
- Sustainability (6)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (39)
- Assessment project [sub-heading only] (18)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (182)
- Demolition project (11)
- Excavation (7)
- Extension project (19)
- Fire safety assessment (2)
- Groundworks project (1)
- Maintenance project (3)
- New build (87)
- Refurbishment (19)
- Remediation project (20)
- Repair project (7)
- Strengthening project (6)
- Structural assessment (27)
- Underpinning project (4)
Construction period
Method of construction
Elements & systems
- Arch (2)
- Balconies (17)
- Balustrades (20)
- Basements (13)
- Beams (55)
- Bracing (17)
- Cables (1)
- Canopies (8)
- Ceilings (23)
- Cladding (35)
- Columns (38)
- Fasteners & connections (110)
- Fences (1)
- Fire exit doors (2)
- Fire protection (15)
- Foundations (22)
- Insulation (10)
- Light gauge steel framing (7)
- Lintels (4)
- Padstones (5)
- Parapets (10)
- PV panels (3)
- Roofs (78)
- Sandwich panels (3)
- Shear walls (4)
- Signs (2)
- Slabs (48)
- Tendons (2)
- Trusses (10)
- Wall head restraints (3)
- Walls (73)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 1 (6)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (3)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (6)
- CROSS-UK Newsletter 6 (5)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (6)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (7)
- CROSS-UK Newsletter 13 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (3)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (7)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (4)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (4)
- CROSS-UK Newsletter 41 (6)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (4)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (6)
- CROSS-UK Newsletter 51 (6)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (6)
- CROSS-UK Newsletter 55 (5)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (4)
- CROSS-UK Newsletter 58 (8)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (6)
- CROSS-UK Newsletter 61 (3)
- CROSS-UK Newsletter 62 (7)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (8)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (9)
- CROSS-UK [sub-heading only] (231)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 2 (6)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (8)
- CROSS Feature Article (1)
- CROSS Newsletter (141)
- CROSS Safety Alert (12)
- CROSS Safety Report (482)
- CROSS Theme Page (1)
- CROSS Topic Paper (9)
- News [sub-heading only] (45)
- Safety information from CROSS [sub-heading only] (4)
- Safety information [sub-heading only] (5)
- Third party content (9)
- Third party content (5)
CROSS regions
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Serious inconsistencies when installing passive fire protection
An onsite fire engineer, engaged on behalf of the end client during the construction of a new residential development, reports a significant amount of inadequately installed passive fire protection elements.
20 November 2023
CROSS Safety Report
Report ID: 1199
Region: CROSS-UK
Inadequate fire stopping around cables and other penetrations
A reporter observed inadequate fire stopping due to both ineffective installation or damage caused by follow on trades.
21 August 2023
CROSS Safety Report
Report ID: 1201
Region: CROSS-UK
Potential overcrowding in education premises
A reporter expresses concern about the potential for greater occupancy numbers than planned for in lecture theatres within education premises.
21 August 2023
CROSS Safety Report
Report ID: 1202
Region: CROSS-UK
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Provision of water for firefighting
A reporter suggests that there is inadequate guidance on firefighting water provision for more complex and larger buildings.
20 November 2023
CROSS Safety Report
Report ID: 1204
Region: CROSS-UK
Inquiry into the construction of Edinburgh Schools
This Alert deals with the aftermath of the collapse of part the outer skin of a cavity wall at Oxgangs Primary School Edinburgh on 29th January 2016 in high winds.
1 February 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Incorrect use of software for wind loads on solar panels
A reporter is concerned about designers relying completely on the output of software for structural analysis when they do not fully understand the requirements for data input.
7 November 2023
CROSS Safety Report
Report ID: 1212
Region: CROSS-AUS
Structural stability/integrity of steel frame buildings
There are occasional collapses of steel frame structures during construction and this Alert is to draw attention to matters which need to be borne in mind by designers, fabricators, and contractors.
1 February 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK