Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Content type
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 64 (3)
- CROSS-UK Newsletter 65 (4)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (5)
- CROSS-UK [sub-heading only] (7)
- CROSS Feature Article (1)
- CROSS Newsletter (11)
- CROSS Safety Report (48)
- News [sub-heading only] (1)
CROSS regions
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK
Polyethylene core cladding panels on a high-rise building
A reporter has raised concerns based on a past visit to a residential tower block in 2011 that had a similar type of rainscreen panel to the one used on the Grenfell Tower.
1 July 2017
CROSS Safety Report
Report ID: 682
Region: CROSS-UK
Widespread fire safety failings in residential blocks
A reporter highlights fire safety issues that were found during investigations of building defects in residential blocks.
1 January 2018
CROSS Safety Report
Report ID: 706
Region: CROSS-UK
Risk of fire spread through service ducts
A reporter highlights that the risk of spread of smoke, hot gases and flames due to deficiencies in service ducts is an important subject that needs detailed investigation.
1 January 2018
CROSS Safety Report
Report ID: 707
Region: CROSS-UK
Combustible insulation under rainscreen cladding
Whilst walking past a tall residential building under construction, a reporter observed the facade build-up to consist of combustible insulation with a rainscreen cladding.
1 April 2018
CROSS Safety Report
Report ID: 726
Region: CROSS-UK
Fire hazards in historical modular timber framed buildings
A reporter has raised fire safety concerns suggesting the potential existence of a systemic issue pertaining to the design and construction of modular timber frame systems.
20 February 2024
CROSS Safety Report
Report ID: 1243
Region: CROSS-UK
The risk of collapse of multi-storey CLT buildings during a fire
A reporter presents concerns about the fire safety of multi-storey buildings comprised of cross-laminated timber (CLT) structures.
29 March 2021
CROSS Safety Report
Report ID: 966
Region: CROSS-UK
Fire protection of steelwork supporting a timber floor
A reporter shares concerns that developers and Building Control officials are assuming that, if a timber joist floor construction is suitable to provide 30 minutes fire resistance loadbearing capacity then the structural steel supporting members within it will be similarly protected.
20 February 2024
CROSS Safety Report
Report ID: 1234
Region: CROSS-UK
Non approved sealants are used with CPVC pipes and fittings
A reporter highlights a concern when non approved sealants are used with chlorinated polyvinyl chloride (CPVC) sprinkler system pipework and fittings. This can cause failures and/or leaks.
20 February 2024
CROSS Safety Report
Report ID: 1228
Region: CROSS-UK