Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 64 (3)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK [sub-heading only] (8)
- (-) CROSS Newsletter (16)
- CROSS Safety Report (16)
CROSS regions
The risk of collapse of multi-storey CLT buildings during a fire
A reporter presents concerns about the fire safety of multi-storey buildings comprised of cross-laminated timber (CLT) structures.
29 March 2021
CROSS Safety Report
Report ID: 966
Region: CROSS-UK
Ineffective fire socks
A reporter shares their concern about how the quality of fire stopping in a residential project was found to be substandard and the potential reasons that led to this happening.
10 March 2022
CROSS Safety Report
Report ID: 1115
Region: CROSS-UK
Change of use to care home
A report has been received relating to the intended change of use of a large building.
6 June 2022
CROSS Safety Report
Report ID: 1078
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Testing of smoke control systems
A reporter is concerned about the way that smoke control systems in residential buildings are commissioned, installed, tested, and maintained.
10 March 2022
CROSS Safety Report
Report ID: 1099
Region: CROSS-UK
Intumescent paint application
A report has been received regarding issues of detailing by following the relevant advice provided from an intumescent paint supplier.
6 June 2022
CROSS Safety Report
Report ID: 1113
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Metal cladding panels blowing in the wind
A local authority was called to investigate a dangerous structure where metal cladding panels on the 10th floor of a student accommodation block were flapping in high winds.
1 January 2015
CROSS Safety Report
Report ID: 461
Region: CROSS-UK
Cantilevered brickwork - fatal collapse during construction
A blade of 270mm cavity brickwork in a temporary condition fell and killed a bricklayer after sixteen scaffold planks were leant against the wall on the side remote from the bricklayer.
1 April 2015
CROSS Safety Report
Report ID: 476
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.