Safety information search results
Filter your results
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (4)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (31)
- Demolition project (1)
- Excavation (1)
- Extension project (2)
- Fire safety assessment (1)
- Groundworks project (1)
- New build (11)
- Refurbishment (3)
- Remediation project (4)
- Repair project (2)
- Structural assessment (6)
Method of construction
Elements & systems
- Arch (1)
- Balconies (2)
- Balustrades (2)
- Beams (6)
- Bracing (2)
- Cables (2)
- Ceilings (2)
- Cladding (3)
- Columns (4)
- Fasteners & connections (11)
- Fire protection (4)
- Foundations (1)
- Insulation (2)
- Light gauge steel framing (2)
- Parapets (1)
- PV panels (1)
- Roofs (7)
- Sandwich panels (1)
- Signs (1)
- Slabs (6)
- Tendons (2)
- Trusses (2)
- Walls (12)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (3)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 23 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 49 (4)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (5)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (54)
- CROSS Newsletter (28)
- CROSS Safety Alert (5)
- CROSS Safety Report (73)
- CROSS Topic Paper (1)
- News [sub-heading only] (14)
CROSS regions
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Concern about foundations to telecoms masts
Concerns are raised about a potential safety problem with the design and construction of ‘root’ foundations for telecom poles.
1 January 2018
CROSS Safety Report
Report ID: 690
Region: CROSS-UK
Undermined bridge wing wall collapses
A masonry wing wall of a bridge collapsed and fell as a single section coming to rest against an adjacent pile after being undermined on site.
1 April 2016
CROSS Safety Report
Report ID: 577
Region: CROSS-UK
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574
Region: CROSS-UK
Ensuring CDM safety files are transferred after change of ownership
Concerns are raised that there is no effective system in place to ensure CDM safety files are passed on to new owners when properties change hands.
1 January 2017
CROSS Safety Report
Report ID: 581
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Embankment slip during excavation works
Concerns were raised and strengthening works required after vertical movement was observed on the safety critical surface at the top of an 8m high embankment.
1 October 2016
CROSS Safety Report
Report ID: 572
Region: CROSS-UK
Wind loads acting on timber frame walls for designs to BS 5268-6
A reporter says that the masonry shielding factors in BS 5268-6 (K100 and K200) were substantially reduced when PD 6693-1 for designs to EC5 was produced.
1 April 2019
CROSS Safety Report
Report ID: 624
Region: CROSS-UK
Stability of existing structures impacting construction sites
A reporter discusses the clients and principal contractors duties regarding the stability of existing structures on site, particularly those scheduled for demolition.
1 January 2018
CROSS Safety Report
Report ID: 693
Region: CROSS-UK
Dangerous balcony construction
During an investigation of a balcony construction, a reporter discovered serious inadequacies related to a total lack of coordination between sub-contract work packages coupled with a lack of appropriate supervision.
1 January 2018
CROSS Safety Report
Report ID: 694
Region: CROSS-UK