Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
The selection and installation of construction fixings
SCOSS has been concerned for some time at the use of structural fixings where these so called minor items have not received the attention they deserve given their safety critical nature.
1 September 2010
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Ceiling collapse in an educational building
A suspended ceiling in a large teaching hall collapsed days before the official opening of a new educational building.
1 April 2008
CROSS Safety Report
Report ID: 100
Region: CROSS-UK
Serious injury from free standing wall collapse
A 100mm wide brick masonry wall in a garden collapsed seriously injuring one person.
1 January 2008
CROSS Safety Report
Report ID: 94
Region: CROSS-UK
Suspended granite ceiling collapse
This report is in relation to the selection of fixings for a suspended ceiling of granite which collapsed in the entrance area of a new office building due to failures of the fixings.
1 January 2010
CROSS Safety Report
Report ID: 148
Region: CROSS-UK
Collapse of infill wall panel
A blockwork infill wall panel approximately 4m wide and 9m high between two building collapsed in high winds.
1 July 2015
CROSS Safety Report
Report ID: 511
Region: CROSS-UK
Failure of precast concrete 'L' shaped retaining wall
A recent incident occurred on a site, where a temporary precast retaining wall failed leading to a pile of clay approximately 3m high spilling through the wall.
1 July 2014
CROSS Safety Report
Report ID: 433
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.