Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS Newsletter (4)
- CROSS Safety Report (16)
- News [sub-heading only] (2)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Low pitched metal sheet roofs
A reporter is concerned about low pitch metal sheet roofing attached to trussed rafters.
1 April 2007
CROSS Safety Report
Report ID: 66
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Example of small temporary stage structure
This is an example of a small stage that is potentially unstable.
1 January 2013
CROSS Safety Report
Report ID: 302
Region: CROSS-UK
Overloading a portal frame with suspended services
A reporter designing a single storey portal frame used a standard roof service loading of 0.25kN/m2. After the project was completed, a tenant for the unit took over fit out and added a considerable amount of sprinkler pipework into the roof. This created local overloading.
21 August 2023
CROSS Safety Report
Report ID: 1195
Region: CROSS-UK
Retaining wall collapse
A retaining wall is reported to have collapsed four times during the course of its life.
1 April 2007
CROSS Safety Report
Report ID: 76
Region: CROSS-UK
Wind on internal masonry walls during construction
There has been a generic report from a contractor about internal masonry walls during construction following his experiences of failures.
1 October 2007
CROSS Safety Report
Report ID: 82
Region: CROSS-UK
Non-structural roof soffit linings - failure
A reporter has observed the occurrence of compressed fibre cement sheets becoming dislodged from the soffit of several buildings in Australia.
1 January 2015
CROSS Safety Report
Report ID: 462
Region: CROSS-UK