Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Construction period
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK [sub-heading only] (36)
- CROSS Newsletter (24)
- CROSS Safety Report (54)
- News [sub-heading only] (7)
CROSS regions
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Collapse of Large Panel System (LPS) buildings during demolition
In 2009, numerous progressive and unexpected collapses occurred during the demolition of Large Panel System (LPS) tower blocks.
1 April 2010
CROSS Safety Report
Report ID: 186
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Permanent formwork to slabs
Concerns are raised over deflection issues that are not being considered when using permanent formwork.
1 January 2011
CROSS Safety Report
Report ID: 215
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Collapse of a hollow core unit
This refers to the collapse of one modest span precast hollow core concrete unit and the excessive deflection of others on a building which was under construction.
1 October 2012
CROSS Safety Report
Report ID: 258
Region: CROSS-UK
Foundation base plates for tower cranes
On two different contracts it was observed that the foundation base plates for tower cranes had suffered from low compaction of the concrete on which they rest.
1 October 2011
CROSS Safety Report
Report ID: 257
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.