Safety information search results
Filter your results
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK [sub-heading only] (19)
- CROSS Newsletter (5)
- CROSS Safety Report (24)
- News [sub-heading only] (2)
CROSS regions
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Loading reinforced masonry wall
A 2.5m high retaining wall showed signs of movement not long after backfilling, and it was found that the deflection was due to creep in the bed joints of the immature wall.
1 April 2010
CROSS Safety Report
Report ID: 178
Region: CROSS-UK
Failed two storey retaining wall
A two storey high retaining wall adjacent to a house collapsed.
1 October 2011
CROSS Safety Report
Report ID: 240
Region: CROSS-UK
Critical wall failure
There has been a report about the top triangle of a brickwork gable in a relatively modern building collapsing in high winds and very seriously injuring two passers-by.
1 July 2009
CROSS Safety Report
Report ID: 135
Region: CROSS-UK
Suspended granite ceiling collapse
This report is in relation to the selection of fixings for a suspended ceiling of granite which collapsed in the entrance area of a new office building due to failures of the fixings.
1 January 2010
CROSS Safety Report
Report ID: 148
Region: CROSS-UK
Collapse of blockwork retaining wall
An 18m length of a 29m long by 140mm thick 2m high dense concrete block retaining wall collapsed hours after being backfilled.
1 October 2009
CROSS Safety Report
Report ID: 162
Region: CROSS-UK
Deadly retaining wall
A blockwork retaining wall, about 2.5 metres high suddenly collapsed causing a fatality.
1 July 2009
CROSS Safety Report
Report ID: 134
Region: CROSS-UK
Near collapse of masonry highway bridge
Works adjacent to a masonry arch bridge caused the foundations to subside and damage the bridge beyond repair.
1 October 2012
CROSS Safety Report
Report ID: 286
Region: CROSS-UK
Lifting bolt failure
A major contractor reported an incident that had occurred in which a threaded eyebolt failed during an operation to lift a section of stonework into place.
1 July 2008
CROSS Safety Report
Report ID: 110
Region: CROSS-UK
Shop/domestic building collapse
A two storey corner (end of terrace) property fronting a very busy, narrow major route collapsed during the construction of a new basement.
1 January 2009
CROSS Safety Report
Report ID: 123
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.