Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (20)
- CROSS Newsletter (14)
- CROSS Safety Report (29)
- News [sub-heading only] (2)
CROSS regions
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Inadequate steel beam splice
A reporter raises concerns of an inadequate steel beam splice they came across on site.
1 October 2013
CROSS Safety Report
Report ID: 343
Region: CROSS-UK
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Set up of temporary works
This report highlights the importance of following correct procedures when installing temporary works.
1 July 2019
CROSS Safety Report
Report ID: 797
Region: CROSS-AUS
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Failure of pile load test arrangement
A pile was being load-tested, for confirmation of design pile loads for the foundations of a road bridge, when the web of the deep steel beam used in the testing arrangement buckled.
1 January 2015
CROSS Safety Report
Report ID: 484
Region: CROSS-UK
Policing of CE marking on steelwork
A reporter has a question regarding structural steel safety, particularly on steel gantry systems supporting lifting equipment.
1 July 2015
CROSS Safety Report
Report ID: 510
Region: CROSS-UK
Fabrication issues with imported steelwork truss in Australia
A reporter raises concerns after a steel truss had significant defects and deflected after erection requiring rectification.
1 July 2014
CROSS Safety Report
Report ID: 390
Region: CROSS-UK
Contractor varies structural design intention
A reporter was made aware by the building owner of an unauthorised structural alteration that had been made on site.
1 January 2015
CROSS Safety Report
Report ID: 420
Region: CROSS-UK
Overloading metal decking in temporary state
During construction of steel structures with composite metal decking floors, a reporter has observed numerous occasions when the metal decking was close to being overloaded.
1 August 2020
CROSS Safety Report
Report ID: 919
Region: CROSS-AUS