Safety information search results
Filter your results
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK [sub-heading only] (14)
- CROSS Newsletter (5)
- CROSS Safety Report (20)
- News [sub-heading only] (1)
CROSS regions
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Loading reinforced masonry wall
A 2.5m high retaining wall showed signs of movement not long after backfilling, and it was found that the deflection was due to creep in the bed joints of the immature wall.
1 April 2010
CROSS Safety Report
Report ID: 178
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Failed two storey retaining wall
A two storey high retaining wall adjacent to a house collapsed.
1 October 2011
CROSS Safety Report
Report ID: 240
Region: CROSS-UK
Divided design responsibilities
A reporter raises concerns after overall responsibility on a project appears to have been apportioned out to individual parties rather than having one structural consultant onboard to pull all the various aspects together.
1 October 2010
CROSS Safety Report
Report ID: 151
Region: CROSS-UK
Near collapse of masonry highway bridge
Works adjacent to a masonry arch bridge caused the foundations to subside and damage the bridge beyond repair.
1 October 2012
CROSS Safety Report
Report ID: 286
Region: CROSS-UK
Shop/domestic building collapse
A two storey corner (end of terrace) property fronting a very busy, narrow major route collapsed during the construction of a new basement.
1 January 2009
CROSS Safety Report
Report ID: 123
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.