Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK [sub-heading only] (22)
- CROSS Newsletter (17)
- CROSS Safety Report (35)
- News [sub-heading only] (3)
CROSS regions
Incorrect scaffold installation
A reporter describes how the Temporary Works Coordinator observed that tension connections on standards for a scaffold system were either omitted or had incorrect pins/bolts used.
1 January 2018
CROSS Safety Report
Report ID: 700
Region: CROSS-UK
Designed scaffold built incorrectly
A Temporary Works Coordinator (TWC) found that scaffolding was not constructed in accordance with the approved design drawings and a number of unauthorised modifications had been made.
1 January 2018
CROSS Safety Report
Report ID: 701
Region: CROSS-UK
Dangerous modification during construction of five storey block of flats
A reporter was asked to investigate a five storey timber framed block of flats after the leaseholder of the top floor reported gaps appearing between oak floorboards.
1 January 2018
CROSS Safety Report
Report ID: 699
Region: CROSS-UK
Scaffold lifting beams incorrectly installed
During the inspection of scaffolding prior to loading, it was observed that there were lifting beams with end stops and ultimate stop cross bolts incorrectly installed.
1 January 2018
CROSS Safety Report
Report ID: 702
Region: CROSS-UK
Serious safety failings of high level lattice girder walkways
A reporter discusses extremely serious safety failings with the construction of two new high level lattice girder walkways in the fly tower of a theatre.
1 January 2018
CROSS Safety Report
Report ID: 697
Region: CROSS-UK
Late detection of flange/web splitting on steel beam
A reporter noticed a crack at the interface between the flange and web for a chord member in a steel truss while it was being loaded on to a delivery truck.
1 October 2019
CROSS Safety Report
Report ID: 680
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Alteration of calculations on constructed loft conversion
A reporter says they were pressurised to adjust structural design calculations to pass a building control check.
1 July 2016
CROSS Safety Report
Report ID: 580
Region: CROSS-UK