Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 5 (1)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (9)
- CROSS Safety Report (20)
- News [sub-heading only] (3)
CROSS regions
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Substitution of undersize steel sections
A reporter feels it is necessary to report a similar but more basic problem on the failure of certified steel products.
1 October 2013
CROSS Safety Report
Report ID: 369
Region: CROSS-UK
Issues with imported steel
Defective steel, says a reporter, was found in a major retail store where the material had been imported from a supplier overseas.
1 October 2014
CROSS Safety Report
Report ID: 474
Region: CROSS-UK
Alteration to historic column bases causes settlement issues
Historic timber columns settled and tilted after unauthorised changes were made to their foundation bases.
1 October 2014
CROSS Safety Report
Report ID: 458
Region: CROSS-UK
Dangerous alterations to steel beam supports
A local authority building control officer went to site and witnessed on an upper floor that the columns had been removed out of sequence, before the new frame had been constructed.
1 October 2015
CROSS Safety Report
Report ID: 479
Region: CROSS-UK
Unauthorised structural alterations to accommodate drainpipes
A reporter became aware of cases where main structural steel sections were ‘butchered’ on site to accommodate drainpipes.
1 July 2020
CROSS Safety Report
Report ID: 902
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Inadequate punching shear reinforcement in flat slabs
This report highlights how remedial works were required in a number of residential buildings after inadequate punching shear reinforcement was identified.
14 October 2020
CROSS Safety Report
Report ID: 950
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Lighting pole strikes live overhead cable
An excavator operator accidentally struck a live overhead cable during the installation of a lighting pole.
1 April 2017
CROSS Safety Report
Report ID: 605
Region: CROSS-UK