Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
CROSS regions
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Continuously threaded reinforcing bar
This report highlights the difficulty of inspecting continuously threaded reinforcing bars to ensure that they have been adequately inserted into the cast-in ferrules.
2 August 2022
CROSS Safety Report
Report ID: 1074
Region: CROSS-AUS
Retaining wall concerns and the stance of a local authority
A reporter was asked by a client to assess a retaining wall built on their boundary by a neighbour who had erected a new dwelling. A review of the calculations and a typical section gave serious concern for its strength.
1 July 2010
CROSS Safety Report
Report ID: 189
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Unstable concrete blocks
A reporter from a consulting firm was called to a site where the blocks in a retaining wall were found to be expanding and falling apart.
1 April 2010
CROSS Safety Report
Report ID: 174
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Concern about rebending starter bars
This report concerns the bending and rebending of starter bars on site during the construction of a multi storey tower. The reporter considered that such a practice could compromise the structure under extreme load conditions.
24 May 2023
CROSS Safety Report
Report ID: 1164
Region: CROSS-UK
Missing starter bars
During an inspection the reporter observed that all the continuity starter bars projecting from the wall kicker were in fact loose.
1 July 2007
CROSS Safety Report
Report ID: 37
Region: CROSS-UK
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Composition of new precast concrete blocks
A UK firm has raised concerns over a new large precast concrete block range which seems to use a wide range of secondary recycled aggregates in its mix, including some potentially hazardous waste.
1 July 2014
CROSS Safety Report
Report ID: 380
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.