Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK [sub-heading only] (50)
- CROSS-US Newsletter 3 (2)
- CROSS Newsletter (39)
- CROSS Safety Report (77)
- News [sub-heading only] (10)
CROSS regions
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Verification of inspection documents
A reporter raises concern after evidence had recently been received that an increased number of ‘copies’ of the supplier’s inspection certificates for heavy plate products had been modified from the original state or falsified.
1 April 2011
CROSS Safety Report
Report ID: 226
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Defective imported scaffold ties
On a contract where multi lift access scaffolds had been installed for a period of up to 18 months in an exposed coastal location, it was found by a reporter on one of the regular inspections that some of the scaffold ties had failed.
1 April 2011
CROSS Safety Report
Report ID: 230
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK