Safety information search results
Filter your results
Building or structure type
- Bridges (24)
- Buildings
(130)
- Commercial (9)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (5)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Public, religious & civic buildings (5)
- Recreational buildings (5)
- Residential (40)
- Stadiums (1)
- Storage buildings (2)
- Tall buildings (4)
- Theatres & other entertainment buildings (5)
- Transport buildings (2)
- Buried pipes & culverts (1)
- Car parks (3)
- Flats & apartments (10)
- Hotels & hostels (1)
- Houses (20)
- Masts & towers (8)
- Railways (4)
- Retaining structures (11)
- Roads (5)
- Sewers (2)
- Temporary structures (10)
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
- Alteration & conversion project (15)
- Construction project [sub-heading only] (119)
- Demolition project (3)
- Excavation (9)
- Extension project (6)
- Groundworks project (2)
- Maintenance project (1)
- New build (67)
- Refurbishment (5)
- Remediation project (7)
- Repair project (3)
- Strengthening project (2)
- Structural assessment (1)
- Underpinning project (3)
Elements & systems
- Arch (1)
- Balconies (4)
- Balustrades (5)
- Basements (5)
- Beams (31)
- Bracing (8)
- Cables (1)
- Canopies (1)
- Ceilings (9)
- Cladding (15)
- Columns (18)
- Fasteners & connections (69)
- Fire protection (4)
- Foundations (22)
- Insulation (2)
- Light gauge steel framing (4)
- Lintels (2)
- Padstones (3)
- Parapets (2)
- Roofs (10)
- Sandwich panels (1)
- Signs (1)
- Slabs (15)
- Trusses (5)
- Wall head restraints (2)
- Walls (44)
- Wall ties (7)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (5)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (4)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (3)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (6)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (5)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (5)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (4)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (137)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (2)
- CROSS-US Newsletter 3 (2)
- CROSS-US [sub-heading only] (3)
- CROSS Newsletter (86)
- CROSS Safety Report (224)
- News [sub-heading only] (24)
CROSS regions
Roof collapse at a social club
This is a report about a roof collapse that occurred, in about 1985, because only half as many parallel faced timber roof trusses were installed as there should have been.
30 June 2022
CROSS Safety Report
Report ID: 942
Region: CROSS-UK
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Specifying resin by colour causes confusion
A mistake occurred on-site when resin for fixings was selected by colour of packaging rather than by colour of resin. The actual resin used did not reach sufficient strength and the installed fixing failed under a pull test.
10 March 2022
CROSS Safety Report
Report ID: 1068
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Continuously threaded reinforcing bar
This report highlights the difficulty of inspecting continuously threaded reinforcing bars to ensure that they have been adequately inserted into the cast-in ferrules.
2 August 2022
CROSS Safety Report
Report ID: 1074
Region: CROSS-AUS
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Retaining wall concerns and the stance of a local authority
A reporter was asked by a client to assess a retaining wall built on their boundary by a neighbour who had erected a new dwelling. A review of the calculations and a typical section gave serious concern for its strength.
1 July 2010
CROSS Safety Report
Report ID: 189
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK