Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
- Balconies (1)
- Balustrades (2)
- Basements (2)
- Beams (17)
- Bracing (2)
- Cables (1)
- Ceilings (1)
- Cladding (2)
- Columns (6)
- Fasteners & connections (22)
- Fire protection (2)
- Foundations (9)
- Light gauge steel framing (1)
- Lintels (1)
- Parapets (1)
- Roofs (2)
- Slabs (3)
- Wall head restraints (1)
- Walls (13)
- Wall ties (2)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (4)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK [sub-heading only] (72)
- CROSS Newsletter (47)
- CROSS Safety Report (91)
- News [sub-heading only] (13)
CROSS regions
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Remoteness of contact and lack of supervision
A correspondent has been thinking about the problem of lack of supervision in construction generally and has come to the conclusion that this is all part of a wider problem.
1 January 2019
CROSS Safety Report
Report ID: 684
Region: CROSS-UK
Poor quality of construction and lack of supervision on a block of flats
Concerns are raised over poor quality construction and a lack of supervision on a residential block of flats.
1 July 2017
CROSS Safety Report
Report ID: 672
Region: CROSS-UK
Unstable pre-slung rebar bundles
A contractor has issued a safety alert about pre-slung loads of rebar which has resulted in loads being out of balance when unloaded on site.
1 April 2016
CROSS Safety Report
Report ID: 565
Region: CROSS-UK
Alteration of calculations on constructed loft conversion
A reporter says they were pressurised to adjust structural design calculations to pass a building control check.
1 July 2016
CROSS Safety Report
Report ID: 580
Region: CROSS-UK
Inadequate storage of glazing panels
A reporter raises concerns about how glazing panels are being stored on sites. They have witnessed scenarios where panels are not being individually tied back to storage frames or to a secure place.
1 April 2016
CROSS Safety Report
Report ID: 532
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Independence of Approved Inspectors
A reporter believes public awareness should be raised regarding the possibility that building control can be performed under a business to business commercial contract for the interest of someone other than property owners.
1 July 2015
CROSS Safety Report
Report ID: 507
Region: CROSS-UK
Policing of CE marking on steelwork
A reporter has a question regarding structural steel safety, particularly on steel gantry systems supporting lifting equipment.
1 July 2015
CROSS Safety Report
Report ID: 510
Region: CROSS-UK