Safety information search results
Filter your results
Building or structure type
- Bridges (25)
- Buildings
(156)
- Commercial (11)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (9)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Public, religious & civic buildings (5)
- Recreational buildings (5)
- Residential (46)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (4)
- Theatres & other entertainment buildings (6)
- Transport buildings (3)
- Buried pipes & culverts (2)
- Car parks (4)
- Flats & apartments (12)
- Hotels & hostels (1)
- Houses (21)
- Masts & towers (9)
- Railways (4)
- Retaining structures (12)
- Roads (5)
- Sewers (2)
- Temporary structures (12)
Building height
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (17)
- Construction project [sub-heading only] (129)
- Demolition project (5)
- Excavation (9)
- Extension project (6)
- Groundworks project (2)
- Maintenance project (2)
- New build (70)
- Refurbishment (6)
- Remediation project (8)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (2)
- Underpinning project (3)
Elements & systems
- Arch (1)
- Balconies (4)
- Balustrades (5)
- Basements (5)
- Beams (35)
- Bracing (9)
- Cables (1)
- Canopies (1)
- Ceilings (13)
- Cladding (18)
- Columns (20)
- Fasteners & connections (86)
- Fire protection (4)
- Foundations (26)
- Insulation (2)
- Light gauge steel framing (4)
- Lintels (2)
- Padstones (3)
- Parapets (3)
- Roofs (16)
- Sandwich panels (1)
- Shear walls (2)
- Signs (1)
- Slabs (18)
- Trusses (5)
- Wall head restraints (3)
- Walls (49)
- Wall ties (9)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (5)
- CROSS-UK Newsletter 1 (3)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (4)
- CROSS-UK Newsletter 6 (4)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (3)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (6)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (5)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (5)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (4)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (156)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 2 (4)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (7)
- CROSS Newsletter (90)
- CROSS Safety Report (261)
- News [sub-heading only] (28)
CROSS regions
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Removal of internal structure
The roof trusses, 6m above the ground floor, had been left supported on props made by nailing floor joists together; one at each party wall position.
1 July 2006
CROSS Safety Report
Report ID: 46
Region: CROSS-UK
Liquid metal assisted cracking (LMAC)
A reporter raises concerns about the risk of liquid metal assisted cracking during the hot dip galvanising process.
1 November 2006
CROSS Safety Report
Report ID: 45
Region: CROSS-UK
Fixings to steelwork
The use of proprietary self tapping screws to fix to materials thicker than 10-12mm is questioned by a reporter.
1 November 2006
CROSS Safety Report
Report ID: 44
Region: CROSS-UK
Building regulations submissions
This report has been written on behalf of a group of senior local government structural engineers who refer to previous CROSS newsletters and in particular the reports relating to the poor quality of building regulation submissions and lack of checking resources.
1 July 2007
CROSS Safety Report
Report ID: 65
Region: CROSS-UK
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Inadequate underpinning
Works were stopped on site after it was discovered the contractor had completely ignored the specified 5-bay sequence and timing of the underpinning works shown on the design drawings.
1 April 2007
CROSS Safety Report
Report ID: 72
Region: CROSS-UK
Steelwork delivered to site
The contractor on a domestic building project reported that there were deficiencies in steelwork supplied to site.
1 October 2007
CROSS Safety Report
Report ID: 80
Region: CROSS-UK