Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Theme pages
Locations
Content type
- CROSS-UK Newsletter 1 (8)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (38)
- CROSS Newsletter (13)
- CROSS Safety Report (39)
- (-) News [sub-heading only] (39)
CROSS regions
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Columns missing due to 3D modelling
A new eight storey residential concrete frame building was being constructed and several columns were omitted from the ground and first floor level drawings, says a reporter.
1 January 2017
CROSS Safety Report
Report ID: 614
Region: CROSS-UK
Inadequate structural design of school extension
On review of a design for a school extension, a reporter noted several major issues including an almost total lack of vertical bracing throughout the extension.
1 October 2016
CROSS Safety Report
Report ID: 597
Region: CROSS-UK
Heritage balustrade complying with current regulations
A reporter is hoping that CROSS might be able to help with some research for a heritage project.
1 January 2017
CROSS Safety Report
Report ID: 599
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK
Settlement of driven piles
A railway platform was constructed on piled foundations and it was noticed that one pair of piles and their associated cross head settled soon afterwards.
1 April 2017
CROSS Safety Report
Report ID: 607
Region: CROSS-UK
Fixing systems for gravestones
This report is about the safety of pins used to hold headstones in place.
1 October 2016
CROSS Safety Report
Report ID: 601
Region: CROSS-UK
Roof constructed without structural input
A reporter wants to highlight the problem of builders working off plans provided by an architect or surveyor and assuming that section sizes shown on their drawings are structurally adequate.
1 January 2016
CROSS Safety Report
Report ID: 515
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798