Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Construction period
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (5)
- (-) CROSS Safety Report (24)
- News [sub-heading only] (1)
CROSS regions
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Safety issues when adding PV panels to existing roofs
A reporter raises concerns over the lack of structural engineering knowledge and dangerous assumptions, that they have seen, in assessments for the installation of photovoltaic (PV) panels for a number of buildings.
13 December 2021
CROSS Safety Report
Report ID: 1015
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Incorrect modelling of a cantilever
A steel framed building was incorrectly modelled and designed resulting in excessive deflection of part of the frame even before the frame was loaded with the self-weight of the building.
17 November 2022
CROSS Safety Report
Report ID: 1144
Region: CROSS-UK
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Design deficiencies in calculations submitted to a Local Authority
A Local Authority Building Control manager has sent a list which gives twenty nine of the more serious design review queries raised by the building control structural checking process over the last five years.
1 October 2010
CROSS Safety Report
Report ID: 210
Region: CROSS-UK
Checking at a price
In relation to the checking of calculations on behalf of local authorities for building regulation submissions a reporter is concerned about checking engineers who are paid very low hourly rates.
1 October 2011
CROSS Safety Report
Report ID: 227
Region: CROSS-UK
Effect of staff change on a design
A reporter illustrates how risk can be generated from staff turnover.
1 October 2012
CROSS Safety Report
Report ID: 277
Region: CROSS-UK
Building regulations submissions
This report has been written on behalf of a group of senior local government structural engineers who refer to previous CROSS newsletters and in particular the reports relating to the poor quality of building regulation submissions and lack of checking resources.
1 July 2007
CROSS Safety Report
Report ID: 65
Region: CROSS-UK
Building Regulations submission for a small house
A reporter who is a small builder shares their experience on inadequate design calculations they received for a small house.
1 January 2008
CROSS Safety Report
Report ID: 91
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.