Safety information search results
Filter your results
Project or lifecycle stage
Operation or occupation
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK [sub-heading only] (23)
- CROSS Newsletter (12)
- (-) CROSS Safety Report (32)
- News [sub-heading only] (3)
CROSS regions
Near miss when modifying brickwork
A reporter’s experience of creating a new door opening in an existing brick wall on the first floor of an old building is not always as simple as it would appear.
1 February 2020
CROSS Safety Report
Report ID: 847
Region: CROSS-AUS
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS