Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (7)
- Assessment project [sub-heading only] (1)
- (-) Construction project [sub-heading only] (79)
- Demolition project (2)
- Excavation (2)
- Extension project (6)
- New build (39)
- Refurbishment (4)
- Remediation project (6)
- Repair project (3)
- Strengthening project (3)
- Structural assessment (1)
Method of construction
Elements & systems
- Balconies (5)
- Balustrades (4)
- Beams (23)
- Bracing (10)
- Canopies (1)
- Cladding (3)
- Columns (14)
- Fasteners & connections (33)
- Fire protection (2)
- Foundations (4)
- Insulation (1)
- Light gauge steel framing (5)
- Lintels (1)
- Padstones (3)
- Parapets (1)
- PV panels (1)
- Roofs (6)
- Shear walls (1)
- Slabs (4)
- Trusses (1)
- Walls (10)
- Wall ties (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (46)
- CROSS Newsletter (38)
- (-) CROSS Safety Report (79)
- News [sub-heading only] (17)
CROSS regions
Weld de-specification without design approval
A reporter's firm was engaged as fabricators for a main contractor and asked by them to de-specify full and partial penetration butt welds and replace them with fillet welds without approval from the main design engineer.
14 October 2020
CROSS Safety Report
Report ID: 845
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Unauthorised structural alterations to accommodate drainpipes
A reporter became aware of cases where main structural steel sections were ‘butchered’ on site to accommodate drainpipes.
1 July 2020
CROSS Safety Report
Report ID: 902
Region: CROSS-UK
Fire risks in multi-storey car parks
A reporter is concerned by the reluctance of the industry to voluntarily take on board and proactively react to the lessons learnt from the fire at the Echo Arena car park in Liverpool.
14 October 2020
CROSS Safety Report
Report ID: 940
Region: CROSS-UK
No structural design for steel portal frame building
A reporter is concerned that, in some cases, no structural design is carried out for steel portal framed buildings.
1 January 2020
CROSS Safety Report
Report ID: 866
Region: CROSS-UK
Contractor uses incorrect fixing bolts for masonry support angles
A correspondent noticed that proprietary masonry support angles specified to support the outer leaf of masonry had been incorrectly connected to the steel beam using carriage bolts.
1 July 2019
CROSS Safety Report
Report ID: 794
Region: CROSS-UK
Rotting of cross-laminated timber (CLT) roof panels
This report highlights how a reporter discovered rotted CLT roof panels during the investigation of a roof that had been leaking for a few years.
1 October 2019
CROSS Safety Report
Report ID: 852
Region: CROSS-UK
Products installed without CE-marking due to lower cost
Another report from Germany concerns products that have been delivered and installed on a construction site without any CE marking and Declaration of Performance (DoP) at all.
1 January 2020
CROSS Safety Report
Report ID: 836
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK