Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
- BIM (1)
- Computational design (1)
- Design: quality management (11)
- Design calculations (9)
- Design conceptualisation (1)
- Design detailing (19)
- Design drawings (6)
- Design loads (6)
- Design software (2)
- Dynamics (1)
- Fire safety design (2)
- Resilience (1)
- Robustness (5)
- Structural design (26)
- Sustainability (1)
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Theme pages
Locations
Content type
- CROSS-UK Newsletter 1 (3)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (61)
- CROSS Newsletter (41)
- (-) CROSS Safety Report (82)
- News [sub-heading only] (14)
CROSS regions
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
False CE certificates
This report is about falsified documents in circulation within the EU purporting to be CE certificates.
1 January 2013
CROSS Safety Report
Report ID: 284
Region: CROSS-UK
Steel connector failures and forged certificates
According to a reporter, some suppliers are receiving components that are accompanied by certificates that are potentially false or forged.
1 July 2012
CROSS Safety Report
Report ID: 254
Region: CROSS-UK
Concerns with propping design to large excavations
Concerns are raised about the design of propping to large excavations and particularly about the design of the connections for a raking prop to a horizontal waler.
1 January 2019
CROSS Safety Report
Report ID: 298
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Certification of steel sheet piling
A Government Agency raises concerns about the authenticity of documents provided for steel sheet piles produced by an overseas manufacturer.
1 January 2013
CROSS Safety Report
Report ID: 331
Region: CROSS-UK
Further concerns about competence
A reporter raises concerns about competency, and the points raised demonstrate, says the reporter, a poor grasp first-principles on the part of many designers.
1 July 2013
CROSS Safety Report
Report ID: 339
Region: CROSS-UK
Steel stud failures during bridge construction
This report concerns the failure of a steel studs during construction works on a new bridge associated with major road improvements.
1 October 2012
CROSS Safety Report
Report ID: 332
Region: CROSS-UK
Lack of experience on steel column erection
A reporter highlights how works progressed on site without a detailed method statement being provided by the contractor even though it had been requested.
1 April 2013
CROSS Safety Report
Report ID: 324
Region: CROSS-UK
Chain hoist problem
A reporter raises concerns after brand new proprietary hoists had to be returned to the manufacturer for remedial works.
1 April 2013
CROSS Safety Report
Report ID: 317
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.