Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (19)
- CROSS Newsletter (7)
- (-) CROSS Safety Report (28)
- News [sub-heading only] (5)
CROSS regions
Inadequate design of cantilever glass barriers
A reporter has observed a growing number of cases where cantilever glass balustrades in public buildings are, in their view, inadequately designed.
1 April 2018
CROSS Safety Report
Report ID: 735
Region: CROSS-UK
Collapsed scaffolding
A reporter highlights how, following modest levels of snow fall in the winter, scaffolding erected in order to support a temporary roof collapsed inwards.
1 October 2019
CROSS Safety Report
Report ID: 730
Region: CROSS-UK
Safe use of lifting magnets
A reporter highlights how a two-tonne lift using magnetic lifting equipment was abandoned, averting a potential high consequence event.
1 October 2019
CROSS Safety Report
Report ID: 849
Region: CROSS-UK
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Collapse of a reinforcing cage
The reinforcing cage to a blade pier for an overpass bridge collapsed without warning when nearing completion.
1 August 2020
CROSS Safety Report
Report ID: 941
Region: CROSS-AUS
Principal designers’ obligations for temporary works
A correspondent believes that the new BS5975 standard places some onerous temporary work duties on the principal designer.
1 January 2020
CROSS Safety Report
Report ID: 870
Region: CROSS-UK
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK