Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- (-) CROSS-UK [sub-heading only] (14)
- CROSS Newsletter (8)
- CROSS Safety Report (14)
- News [sub-heading only] (5)
CROSS regions
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Precast concrete demolition
During the demolition of a tower block, a column collapsed unexpectedly.
1 March 2006
CROSS Safety Report
Report ID: 27
Region: CROSS-UK
Compatibility at RC column to slab joint - strong column/weak slab
A reporter who was reviewing the structural design of a commercial building raises concerns over the compatibility at column/slab joints when different grades of concrete are used.
1 April 2012
CROSS Safety Report
Report ID: 296
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Repeating the same design mistakes
A correspondent who investigates engineering failures has shared common errors which engineers keep repeating.
1 October 2019
CROSS Safety Report
Report ID: 858
Region: CROSS-UK
Issues with imported steel
Defective steel, says a reporter, was found in a major retail store where the material had been imported from a supplier overseas.
1 October 2014
CROSS Safety Report
Report ID: 474
Region: CROSS-UK
Flaws with partial encasements around steel columns
A structural assessment found that steel columns encased in concrete to mid-storey height were heavily corroded directly above the top of the encasements.
1 January 2016
CROSS Safety Report
Report ID: 517
Region: CROSS-UK
High strength concrete incident
Confusion on sites lead to the incorrect concrete grade being used for some structural elements.
1 April 2014
CROSS Safety Report
Report ID: 406
Region: CROSS-UK
Unconservative design of flat slab due to software modelling issues
A reporter discusses how a design/modelling problem caused an under-designed reinforced concrete (RC) slab to be constructed.
1 April 2020
CROSS Safety Report
Report ID: 886
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.