Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 57 (1)
- (-) CROSS-UK [sub-heading only] (24)
- CROSS Newsletter (13)
- CROSS Safety Report (24)
- News [sub-heading only] (1)
CROSS regions
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Composition of new precast concrete blocks
A UK firm has raised concerns over a new large precast concrete block range which seems to use a wide range of secondary recycled aggregates in its mix, including some potentially hazardous waste.
1 July 2014
CROSS Safety Report
Report ID: 380
Region: CROSS-UK
Brick wall removed to leave precast panels unsupported
Precast concrete slabs were left unsupported after a supporting brick wall was removed during demolition works.
1 July 2014
CROSS Safety Report
Report ID: 384
Region: CROSS-UK
Boom MEPW falls through precast planks
A high injury potential near-miss (near hit) incident occurred when a mobile elevated working platform (MEPW) fell through a floor at a point where there was a notched precast plank.
1 April 2013
CROSS Safety Report
Report ID: 359
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Steel balconies fixed to precast hollowcore floor planks
A reporter is concerned about the suitability of providing a retrofitted steel balcony requiring moment connections to the sides of typical hollowcore floor planks.
1 July 2017
CROSS Safety Report
Report ID: 620
Region: CROSS-UK
Partial failure of precast concrete tank unit on installation
Concerns are raised after the foot of a precast concrete unit failed during installation, making the unit unstable.
1 April 2017
CROSS Safety Report
Report ID: 626
Region: CROSS-UK
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574
Region: CROSS-UK
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.