Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (1)
- (-) CROSS-UK [sub-heading only] (26)
- CROSS Newsletter (15)
- CROSS Safety Report (26)
- News [sub-heading only] (7)
CROSS regions
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Steelwork delivered to site
The contractor on a domestic building project reported that there were deficiencies in steelwork supplied to site.
1 October 2007
CROSS Safety Report
Report ID: 80
Region: CROSS-UK
Design of head track in cold formed steel framing
The reporter noticed that the in-house structural engineer for the steel frame company had not taken account of all the loads in the design of the head track.
1 November 2006
CROSS Safety Report
Report ID: 39
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Lack of experience on steel column erection
A reporter highlights how works progressed on site without a detailed method statement being provided by the contractor even though it had been requested.
1 April 2013
CROSS Safety Report
Report ID: 324
Region: CROSS-UK
Chain hoist problem
A reporter raises concerns after brand new proprietary hoists had to be returned to the manufacturer for remedial works.
1 April 2013
CROSS Safety Report
Report ID: 317
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.