Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
- Computational design (2)
- Design: quality management (7)
- Design calculations (10)
- Design conceptualisation (3)
- Design detailing (25)
- Design drawings (8)
- Design loads (15)
- Design software (3)
- Dynamics (3)
- Fire safety design (1)
- Resilience (3)
- Robustness (8)
- (-) Structural design (68)
- Sustainability (2)
Operation or occupation
Fire incident response
Project type
- Alteration & conversion project (4)
- Assessment project [sub-heading only] (4)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (31)
- Demolition project (2)
- Excavation (1)
- Extension project (1)
- New build (17)
- Refurbishment (1)
- Remediation project (6)
- Repair project (1)
- Strengthening project (1)
- Structural assessment (5)
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (4)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (6)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK [sub-heading only] (45)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (28)
- CROSS Safety Report (68)
- News [sub-heading only] (11)
CROSS regions
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Thermal effects on long span concrete car park beams
A reporter describes how long span precast hollow core units in a car park started to bow upwards due to thermal effects.
1 October 2010
CROSS Safety Report
Report ID: 173
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK
Structural assessments of multi-storey car parks
The parking industry has in recent years (2012) seen several MSCPs closed due to structural fears, says a reporter, which begs the question how close were they to structural failure before they were taken out of service?
1 April 2012
CROSS Safety Report
Report ID: 224
Region: CROSS-UK
Permanent formwork to slabs
Concerns are raised over deflection issues that are not being considered when using permanent formwork.
1 January 2011
CROSS Safety Report
Report ID: 215
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK