Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Structural stability/integrity of steel frame buildings
There are occasional collapses of steel frame structures during construction and this Alert is to draw attention to matters which need to be borne in mind by designers, fabricators, and contractors.
1 February 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Temporary stage structures
There have been collapses of temporary stage structures in the USA and in Europe during entertainment events.
1 January 2012
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Public art structures
Engineers have noticed a trend and raise concerns over more works of ‘Public Art’ being placed near to highways and in cities.
1 April 2009
CROSS Safety Report
Report ID: 136
Region: CROSS-UK
Poor quality of structural design on high-rise buildings
The correspondent has been very concerned about the quality of structural engineering on some projects in recent years, particularly for certain high-rise buildings.
1 July 2019
CROSS Safety Report
Report ID: 823
Region: CROSS-AUS
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS