Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
- ACM cladding (1)
- Balconies (1)
- Balustrades (2)
- Beams (1)
- Bracing (2)
- Ceilings (4)
- Cladding (12)
- Columns (1)
- (-) Fasteners & connections (29)
- Foundations (1)
- Light gauge steel framing (3)
- Padstones (1)
- Parapets (3)
- Roofs (5)
- Shear walls (1)
- Signs (1)
- Trusses (2)
- Wall head restraints (1)
- Walls (3)
- Wall ties (1)
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (14)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (4)
- CROSS Safety Report (29)
- News [sub-heading only] (2)
CROSS regions
School fascia board failure
A section of pressed steel gutter and plywood fascia board at a school collapsed during or after a heavy rainstorm.
1 April 2009
CROSS Safety Report
Report ID: 137
Region: CROSS-UK
Underpass ceiling collapse
Six months after completion, the ceiling structure to the soffit of an underpass collapsed.
1 July 2009
CROSS Safety Report
Report ID: 140
Region: CROSS-UK
Collapse of proprietary timber roof
A proprietary timber roof system spanning 8m over a school hall collapsed. The roof was constructed in 1959, and formed from a ply-web beam system, with hardboard ceiling and ply deck and asphalt covering.
1 January 2012
CROSS Safety Report
Report ID: 273
Region: CROSS-UK
Timber roof truss bracing problem
Lateral movement of the roof tiles on a two-storey mid-terrace house built approximately 35 years ago with a trussed rafter roof led to the discovery of broken bracing.
1 July 2014
CROSS Safety Report
Report ID: 354
Region: CROSS-UK
School roof timber truss collapse
A gym/assembly hall roof to a school collapsed suddenly and without warning overnight when fortunately the building was unoccupied.
1 January 2012
CROSS Safety Report
Report ID: 249
Region: CROSS-UK
Sliding glass door - two-part subhead failure
Called to inspect the failure of a glazed sliding door system a correspondent noted that the system comprised a two-part subhead, which includes a removable bead that relies on a bearing of only a few millimetres.
1 February 2020
CROSS Safety Report
Report ID: 818
Region: CROSS-AUS
Repeating the same design mistakes
A correspondent who investigates engineering failures has shared common errors which engineers keep repeating.
1 October 2019
CROSS Safety Report
Report ID: 858
Region: CROSS-UK
Metal cladding panels blowing in the wind
A local authority was called to investigate a dangerous structure where metal cladding panels on the 10th floor of a student accommodation block were flapping in high winds.
1 January 2015
CROSS Safety Report
Report ID: 461
Region: CROSS-UK
Non-structural roof soffit linings - failure
A reporter has observed the occurrence of compressed fibre cement sheets becoming dislodged from the soffit of several buildings in Australia.
1 January 2015
CROSS Safety Report
Report ID: 462
Region: CROSS-UK
Cladding panel blown off
A reporter has become aware of an incident where a decorative cladding panel fell from an upper level of a multi-storey building in high winds.
1 October 2015
CROSS Safety Report
Report ID: 498
Region: CROSS-UK