Safety information search results
Filter your results
Building or structure type
- Bridges (17)
- Buildings
(110)
- Agricultural buildings (1)
- Commercial (12)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (10)
- Industrial buildings (1)
- Public, religious & civic buildings (5)
- Recreational buildings (5)
- Residential (20)
- Storage buildings (1)
- Tall buildings (8)
- Theatres & other entertainment buildings (6)
- Transport buildings (4)
- Car parks (2)
- Flats & apartments (4)
- Houses (7)
- Masts & towers (11)
- Offshore structures (1)
- Railways (2)
- Retaining structures (3)
- Roads (1)
- Sewers (1)
- Temporary structures (8)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Method of construction
Elements & systems
- Balconies (5)
- Balustrades (10)
- Beams (23)
- Bracing (9)
- Cables (3)
- Canopies (3)
- Ceilings (20)
- Cladding (25)
- Columns (12)
- (-) Fasteners & connections (177)
- Fire protection (1)
- Foundations (12)
- Insulation (3)
- Light gauge steel framing (5)
- Padstones (1)
- Parapets (5)
- PV panels (1)
- Roofs (15)
- Sandwich panels (1)
- Shear walls (2)
- Signs (2)
- Slabs (2)
- Tendons (1)
- Trusses (7)
- Wall head restraints (1)
- Walls (9)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (5)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (4)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 60 (4)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (96)
- CROSS-US Newsletter 2 (2)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (51)
- CROSS Safety Alert (4)
- CROSS Safety Report (172)
- News [sub-heading only] (23)
- Third party article (1)
- Third party content (1)
CROSS regions
Installation of epoxy resin adhesive for reinforcing bar anchors
Potentially dangerous installation of resin-anchored reinforcing bars, where epoxy resin was applied at the top of the hole after bars had been inserted.
7 November 2023
CROSS Safety Report
Report ID: 1225
Region: CROSS-AUS
Collapse of unusual hybrid concrete and steel strand truss on school roof
This report concerns the collapse of a school hall roof which resulted from the failure of one of a number of unusual hybrid concrete and steel strand trusses. The trusses consist of a precast reinforced concrete top chord and verticals with a bottom chord of tensioned steel strands. The failure of the truss resulted in the collapse of the supported flat roof local to the failed truss, and da...
25 May 2023
CROSS Safety Report
Report ID: 1227
Region: CROSS-UK
Missing elements from 3D modelling
A reporter shares their experience on how their team consistently discover missing elements when they erect lattice towers and masts that have been 3D modelled.
5 September 2022
CROSS Safety Report
Report ID: 792
Region: CROSS-UK
Vertical cross bracing unbolted on-site
A reporter came across a situation where a vertical cross bracing member of a temporary steel frame structure had been unbolted on-site.
10 February 2023
CROSS Safety Report
Report ID: 861
Region: CROSS-UK
Precast concrete panel fixing
A 1960s flyover was being demolished and an interesting feature came to light how the precast concrete edge panels were fixed.
30 June 2022
CROSS Safety Report
Report ID: 965
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Architectural panel acting as barrier
A reporter came across a scenario on site where an architectural decorative panel was acting as a barrier during the construction stage without being designed to act as one.
6 April 2023
CROSS Safety Report
Report ID: 927
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Structural failure of older timber connections
A reporter shares three examples of the structural failure or inadequacies of connections in existing timber structures that they have encountered.
13 December 2021
CROSS Safety Report
Report ID: 1040
Region: CROSS-UK