Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Elements & systems
- Balconies (1)
- Balustrades (1)
- Basements (3)
- Beams (8)
- Bracing (1)
- Cladding (3)
- Columns (5)
- Fasteners & connections (6)
- Foundations (4)
- Insulation (1)
- Light gauge steel framing (2)
- Lintels (1)
- Padstones (3)
- Shear walls (1)
- Slabs (5)
- Wall head restraints (2)
- (-) Walls (53)
- Wall ties (4)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Theme pages
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (31)
- CROSS Newsletter (19)
- CROSS Safety Report (53)
- News [sub-heading only] (4)
CROSS regions
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Inadequate structural design for domestic properties
A reporter has recently been asked to redesign several projects for domestic extensions/alterations, where two structural problems were found.
1 January 2018
CROSS Safety Report
Report ID: 703
Region: CROSS-UK
Unsafe removal of internal walls
A reporter was requested to advise on the removal of some internal walls in a decades’ old multi storey block of council flats after they were removed.
1 October 2018
CROSS Safety Report
Report ID: 714
Region: CROSS-UK
Lack of method statements on domestic projects
A reporter has observed that where an opening is being formed on domestic properties for, say a rear extension, that the builders tend to remove the masonry and follow up with the temporary propping.
1 January 2019
CROSS Safety Report
Report ID: 757
Region: CROSS-UK
Shutter failure during concrete wall pour
A reporter describes how a shutter failed during a concrete wall pour due to resin fixed ties not being allowed to cure.
1 April 2019
CROSS Safety Report
Report ID: 766
Region: CROSS-UK
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Unauthorised alterations to Light Gauge Steel Framing on site
Concerns were raised after Light Gauge Steel Framing (LGSF) acting as a structural system was trimmed locally on site to accommodate the installation of balcony brackets without approval from the design team.
1 July 2018
CROSS Safety Report
Report ID: 669
Region: CROSS-UK
Partial failure of precast concrete tank unit on installation
Concerns are raised after the foot of a precast concrete unit failed during installation, making the unit unstable.
1 April 2017
CROSS Safety Report
Report ID: 626
Region: CROSS-UK