Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
CROSS regions
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Lessons learned from the 2018 Florida bridge collapse during construction
This was a bridge of an unusual design and was being constructed in an unusual manner. The main 53m pre-stressed pre-cast concrete span truss was in position when cracks appeared at a node and over a period of almost three weeks they visibly worsened until collapse occurred.
1 December 2020
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Pre-stressing ducts
A reporter has come across a situation where during grouting of the ducts in a slab, patches of concrete as big as 0.5m x 1m and 30mm thick fell on to the ground creating a safety hazard.
1 October 2008
CROSS Safety Report
Report ID: 89
Region: CROSS-UK
Shear failure during demolition
A reporter raises concerns about how a number of buildings being demolished ‘top-down’ have suffered from partial collapse during the process.
1 January 2016
CROSS Safety Report
Report ID: 523
Region: CROSS-UK
Steel balconies fixed to precast hollowcore floor planks
A reporter is concerned about the suitability of providing a retrofitted steel balcony requiring moment connections to the sides of typical hollowcore floor planks.
1 July 2017
CROSS Safety Report
Report ID: 620
Region: CROSS-UK
Failure of prestressed hollowcore units during storage and transport
A reporter shares their experience of the failure of prestressed hollowcore units during storage and transport.
1 June 2022
CROSS Safety Report
Report ID: 748
Region: CROSS-UK
Concrete system buildings - need for period inspection
Evidence of corrosion of tendons in post-tensioned components came to light which was associated with exposure of tendons to moisture in voids in ducts and sometimes also the presence of chlorides.
1 December 2001
CROSS Safety Alert
Region: CROSS-UK
Problem when launching a prestressed beam
When lowered onto its elastomeric bearings, a 40m span post-tensioned ‘I’ beam started to move towards the outer edge of the pier cap.
30 July 2021
CROSS Safety Report
Report ID: 1027
Region: CROSS-UK
Post-tensioned precast concrete tank failure
A utility company suffered a sudden and catastrophic failure of a concrete tank at a sewage treatment works.
1 July 2009
CROSS Safety Report
Report ID: 147
Region: CROSS-UK
Failure of prestressed hollowcore units during lifting
A reporter raises concerns about how prestressed hollowcore units can fail during lifting if not carefully designed, planned, and managed.
1 October 2018
CROSS Safety Report
Report ID: 749
Region: CROSS-UK