Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (13)
- CROSS Newsletter (7)
- CROSS Safety Report (26)
- News [sub-heading only] (2)
- Third party article (1)
- Third party content (1)
CROSS regions
Preparation of holes in concrete for chemical anchors
Reinforcement intended to be resin anchored into concrete was not anchored, because the resin did not cure, due to contamination within the holes.
6 June 2022
CROSS Safety Report
Report ID: 1096
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Concern about rebending starter bars
This report concerns the bending and rebending of starter bars on site during the construction of a multi storey tower. The reporter considered that such a practice could compromise the structure under extreme load conditions.
24 May 2023
CROSS Safety Report
Report ID: 1164
Region: CROSS-UK
CARES Alert: Unregulated reinforcement continuity systems
CARES is investigating unregulated reinforcement continuity systems entering the construction supply chain.
27 April 2021
Third party content
Publisher: CARES
Aerated concrete slabs
A reporter discusses the failure of precast reinforced autoclaved aerated concrete (RAAC) slabs during construction.
1 October 2007
CROSS Safety Report
Report ID: 55
Region: CROSS-UK, CROSS-AUS, CROSS-US
Concrete half joints
Poor reinforcement detailing and installation in a half joint led to the collapse of a series of beams and precast concrete slabs.
1 January 2008
CROSS Safety Report
Report ID: 88
Region: CROSS-UK
Missing starter bars
During an inspection the reporter observed that all the continuity starter bars projecting from the wall kicker were in fact loose.
1 July 2007
CROSS Safety Report
Report ID: 37
Region: CROSS-UK
Differing reinforcement couplers
On a recent project, because of supply problems, the contractor decided to change from the specified rebar couplers (type ‘A’) to those of another manufacturer (type ‘B’).
1 March 2006
CROSS Safety Report
Report ID: 28
Region: CROSS-UK
Culvert roof slab failure
A culvert, which carries a river under a busy main road, partially collapsed.
1 April 2008
CROSS Safety Report
Report ID: 97
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.