Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (18)
- CROSS Newsletter (13)
- CROSS Safety Alert (1)
- CROSS Safety Report (35)
- News [sub-heading only] (4)
CROSS regions
Estuary bridge - failure of stainless steel tie bars
Concerns were raised after a principal inspection of a bridge found that numerous tie bars connecting the original bridge to strengthened footways had failed.
1 October 2015
CROSS Safety Report
Report ID: 522
Region: CROSS-UK
Flaws with partial encasements around steel columns
A structural assessment found that steel columns encased in concrete to mid-storey height were heavily corroded directly above the top of the encasements.
1 January 2016
CROSS Safety Report
Report ID: 517
Region: CROSS-UK
Lack of lateral stability in steel frame
Concerns were raised after the steel frame of a building was found to have a lack of horizontal and vertical bracing.
1 July 2016
CROSS Safety Report
Report ID: 540
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Concrete encasement falls from bridge girder
Concerns were raised after sections of concrete from the bottom flange of a single encased girder became detached and fell onto an operational line.
1 July 2016
CROSS Safety Report
Report ID: 559
Region: CROSS-UK
Defects found in previously repaired bridge
While carrying out strengthening work on a bridge, there was concern that by removing the non-structural encasement, alternative load paths had been removed.
1 April 2016
CROSS Safety Report
Report ID: 564
Region: CROSS-UK
Deflection of bridge girder under load
A report was received from a bridge examiner to say outer main girder of a short span railway bridge was moving up to 30mm under load.
1 July 2016
CROSS Safety Report
Report ID: 557
Region: CROSS-UK
Further issues with freezing and galvanised hollow sections
A reporter was involved in correcting a cold formed galvanised square hollow section (SHS) four storey balcony structure where longitudinal splits formed in at least two of the four columns.
1 January 2014
CROSS Safety Report
Report ID: 314
Region: CROSS-UK
Square Hollow Section (SHS) expansion due to freezing
A reporter has come across problems in British Columbia (temp range -30 degrees to +40 degrees) of cracking to square hollow sections (SHS) due to the ingress of water and freezing.
1 April 2017
CROSS Safety Report
Report ID: 641
Region: CROSS-UK
Corrosion causes collapse of steel floodlight mast at football club
This is an alert that was issued by a local authority responsible for enforcing the Safety of Sports Grounds Act after a floodlighting mast collapsed at a football club's ground.
1 April 2018
CROSS Safety Report
Report ID: 683
Region: CROSS-UK